Please check the following requirements before testing:
• Installation location is suitable according to Chapter 4.1.3.
• All electrical wires are connected tightly, including PV modules, battery and
AC side(Such as the grid side, EPS side, Gen side).
• Earth line and Smart meter/CT line are connected.
• AF-DF hybrid inverters should be set according to the required local grid
standard.
• More information please contact with Afore or distributors.
6. Power ON/OFF
Power ON/OFF
35
Diese1Gen GenEn ON
TimeCtr1Em ON
TimeDelay 0S
StarSoc 20.0%
EndSoc 80.0%
TimOn1 00:00
TimOff1 00:00
TimOn2 00:00
TimOff2 00:00
TimOn3 00:00
TimOff3 00:00
Note:
Diesel generator enable and time control enabled must be on,
other wise the diesel generator can not be started.
1. Diese1Gen GenEn — Diesel generator enable.
2. TimeCtr1Em — Time control enable.
3. TimeDelay — Delay time of diesel generator
start working.
4. StarSoc — Battery power percentage when
diesel generator start charging the battery.
5. EndSoc — Battery power percentage when
diesel generator stop charging the battery.
6. TimOn1 — Diesel generator start time 1.
7. TimOff1 — Diesel generator off time 2.