background image

e.  Insert the dasher assembly into the freezing cylinder 
as far as possible (Fig. 15) being careful not to damage 
the scraper blades.  Damage will occur to the scraper 
blades and the dispenser will not operate properly if the 
scraper blades are installed facing in a clockwise 
direction (Fig. 16). 

Fig. 15  

Dasher Installation 

Fig. 16 

Dasher Installation 

 

Note: The stator rod has been deleted from Fig. 15 
and Fig. 16 for clarity only.  They must be installed 
for proper machine operation. 

 
f.  While maintaining force against the dasher, rotate it 
slowly until the tongue of the dasher engages the 
groove in the drive system at the rear of the cylinder. 
The outer most portion of the dasher should be 
recessed approximately 1/4” to 3/8” inside the freezing 
cylinder.  No part of the dasher should extend outside 
the cylinder.  Scraper blades should be visible (Fig. 17) 
extending approximately 1/8” beyond the dasher. 

 

CORRECT

 

Blades 

Resting On Tabs

 

Blades Pointing In A 

Counterclockwise 

Direction

 

Fig. 17 

Dasher with Blade (Front View) 

 

2.  Lubricate and assemble the front plate assembly in 
the following manner: 
 
a.  Install the two o-rings on the spigot plunger by 
rolling them onto the plunger.  Seat the o-rings in 
the grooves.  Make certain that they are not twisted. 
Smooth the lubricant into the grooves and over 
the sides of the plunger assembly (Fig. 18). 

 

 

Fig. 18 

Spigot Plunger Lubrication 

 

b.  Slide the lubricated spigot plunger into the front 
plate (Fig. 19)  Align the spigot handle slot to the front. 
c

.   

Insert the spigot handle and secure with the faspin. 

d.  Install the front plate o-ring. 
 

DO NOT LUBRICATE THE FRONT PLATE O-RING 

LUBRICANT WILL MAKE THE FRONT PLATE LEAK  

ASSEMBLY & LUBRICATION 

Lubricate 
Shaded Area 

Approximately 
1/8” Exposed 

Blades Should 
Rest On Tabs

 

Blades Should Not Point 
In A Clockwise Direction

 

INCORRECT

 

PAGE  7 

CAUTION

   

Summary of Contents for SaniServ AccuFreeze

Page 1: ...Reliability from the team that Serves the Best Operation Manual AccuFreeze Shake Dispensers SaniServ An AFFINIS GROUP Company...

Page 2: ...ributor cannot satisfy your service requirements he is authorized to contact the factory for resolution PARTS Always order parts from your SaniServ dealer or distributor When ordering replacement part...

Page 3: ...lade Removal 5 Fig 10 Mix Pan Components 5 Fig 11 Drip Tray Assembly 5 Fig 12 Stator Rod and Dasher Lubrication 6 Fig 13 Dasher Assembly 6 Fig 14 Scraper Blade Installation and Wear Mark 6 Fig 15 Dash...

Page 4: ...iServ machines should have their own dedicated circuits to prevent low voltage conditions caused by other operating equipment 5 The water line connections on water cooled machines is located on the ba...

Page 5: ...each control switch Fig 2 to the CLEANOUT position momentarily to verify the direction of rotation of the dasher Looking at the front of the machine the dasher should rotate counter clockwise 3 Set ea...

Page 6: ...ate briefly and drain the water by pulling downward on the spigot handle After the machine is empty set the control switch to the OFF position Repeat the above procedure as necessary to make certain t...

Page 7: ...sp the o ring with the other hand and roll it out of its groove and off the part Fig 6 6 Remove the carburetor tube Fig 7 from the mix pan Disassemble and clean in the following manner a Remove the o...

Page 8: ...Support Rod Dasher Front View Scraper Blade WARNING DISASSEMBLY CLEANING Drip Drip Tray Drip Tray Support ELECTRICAL SHOCK HAZARD Fig 9a Scraper Blade Removal Fig 9b Scraper Blade Removal PAGE 5 WHEN...

Page 9: ...nd then snapping them over the flat area of the support rod Then rotate the blade downward in a counterclockwise direction as viewed from the front of the dasher Fig 14b Note Reverse the blades at eac...

Page 10: ...r Scraper blades should be visible Fig 17 extending approximately 1 8 beyond the dasher CORRECT Blades Resting On Tabs Blades Pointing In A Counterclockwise Direction Fig 17 Dasher with Blade Front Vi...

Page 11: ...rication to the Mix out probe located in the mix pan see Fig 20 4 Install the drip tray and drip tray insert Fig 21 Fig 21 Drip Tray Assembly 5 Install the o ring on the shake carburetor assembly Fig...

Page 12: ...operation the machine must be sanitized The unit must have already been cleaned and lubricated Note Sanitize immediately before use not several hours before or the previous evening WARNING IMPORTANT O...

Page 13: ...t dispensing the product at the desired consistency after four full cycles refer to the Consistency Control Section of this manual Initial pull down time is 10 15 minutes but may vary due to product m...

Page 14: ...n top of the machine to prevent any foreign materials from contaminating the mix Mixing Make certain that the product mix is prepared according to label instructions Sanitizing Do not soak plastic par...

Page 15: ...nd clean all parts inside of the machine including the base side panels fan blades condensers etc Fig 28 Drip Chute DISCONNECT THE MACHINE FROM ITS POWER SOURCE S BEFORE PERFORMING ANY ROUTINE MAINTEN...

Page 16: ...This page intentionally blank PAGE 13...

Page 17: ...adjust the product consistency to your desired thickness contact your local Certified SaniServ Service Provider CONSISTENCY ADJUSTMENT Fig 31 Hardness Control CAUTION BEFORE PROCEEDING DISCONNECT THE...

Page 18: ...in the up position will cause unit to run continually Front Plate Leaking Confirm front plate o ring is not ripped or torn Replace if necessary Replace seals and o rings every six months Do not lubric...

Page 19: ...ompression for the rear seal Freezing Cylinder The part of the refrigeration mechanism in which the refrigerant vaporizes and absorbs heat This is the part of the freezer where the liquid product is f...

Page 20: ...duct is dispensed from the freezing cylinder than the percentage of liquid product entering the freezing cylinder from the mix pan There are several causes of starving 1 Overdrawing Dispensing more pr...

Page 21: ...Date Service Performed Servicer s Signature Service Record SERVICE RECORD PAGE 18...

Page 22: ...Date Service Performed Servicer s Signature Service Record SERVICE RECORD PAGE 19...

Page 23: ...Notes NOTES PAGE 20...

Page 24: ...oudly made in the U S A Technical Publication 82264 Updated 02 07 451 E County Line Road P O Box 1089 Mooresville Indiana 46158 5089 SaniServ An AFFINIS GROUP Company We are on the web www saniserv co...

Reviews: