background image

AETEK INC.

6F, No.192-1, Lien-Cheng Rd., Chung-Ho, New Taipei City, 235, Taiwan, R.O.C.

|

T

:

 +886- 2-82452822

|

W

:

 www.aetektec.com

|

E

:

 [email protected]

Copyright © 2023 AETEK INC. 

All rights reserved. 

After installing this product on the ceiling, install the included panel. 

Pay attention to the installation direction, align the groove with the notch on the panel

and install it correctly.

●Remove the panel with a flat-head screwdriver.

C42-050-30-A / C42-050-30-B

Installation Steps

Use the ceiling hole template sticker

to dig a hole on the ceiling.

Step 1

Step 2

Step 3

φ150mm

φ150mm

φ150mm

Recommend hole size

for mounting ceiling PoE switch 

is φ150 mm.

Connect LAN cable to

ceiling PoE switch.

Connect 12V / 24V cable to

ceiling PoE switch.

(C42-050-30-B only)

LAN

φ150mm

φ150mm

12V / 24V

DI / DO

Step 4

Step 5

Step 6

Aligh the triangle markings on the cover and
the ceiling switch to snap the cover on the switch.

Push up ceiling PoE switch to

the ceiling hole.

Use a flathead screwdriver to installing

Turn right to lock.

(Turn left release)

Attach cover to

ceiling PoE switch.

Step 7

Step 8

Step 9

140mm

140mm

140mm

45~50mm

Reviews: