AETEK INC.
6F, No.192-1, Lien-Cheng Rd., Chung-Ho, New Taipei City, 235, Taiwan, R.O.C.
|
T
:
+886- 2-82452822
|
W
:
www.aetektec.com
|
E
:
Copyright © 2023 AETEK INC.
All rights reserved.
After installing this product on the ceiling, install the included panel.
Pay attention to the installation direction, align the groove with the notch on the panel
and install it correctly.
●Remove the panel with a flat-head screwdriver.
C42-050-30-A / C42-050-30-B
Installation Steps
Use the ceiling hole template sticker
to dig a hole on the ceiling.
Step 1
Step 2
Step 3
φ150mm
φ150mm
φ150mm
Recommend hole size
for mounting ceiling PoE switch
is φ150 mm.
Connect LAN cable to
ceiling PoE switch.
Connect 12V / 24V cable to
ceiling PoE switch.
(C42-050-30-B only)
LAN
φ150mm
φ150mm
12V / 24V
DI / DO
Step 4
Step 5
Step 6
Aligh the triangle markings on the cover and
the ceiling switch to snap the cover on the switch.
Push up ceiling PoE switch to
the ceiling hole.
Use a flathead screwdriver to installing
Turn right to lock.
(Turn left release)
Attach cover to
ceiling PoE switch.
Step 7
Step 8
Step 9
140mm
140mm
140mm
45~50mm