AIR DRAW INSTALLATION
Air check with screen (included)
Water check installed prior to unit (Included)
Aerus Origins® control valves are highly effective for Iron,
Hydrogen Sulfide and Manganese reduction by using our
unique “air draw” installation to introduce fresh air to the
filter tank for added oxidation.
Air draw is not required in many installations (depending on
Iron, Sulfur and Manganese concentrations), so testing is
advisable.
Factory settings for air draw installation:
•
Valve is programmed for SOFTENER operation
•
YELLOW injector is installed
•
Regeneration is set using CALANDAR CLOCK
•
Regeneration is set for 11:00 PM (may be adjusted)
•
Capacity calculation is set as MANUAL
•
Regen days set at “1” (to backwash every night)
•
Backwash set at 30 MINUTES (may be adjusted)
•
Brine rinse (air draw) set at 30 MINUTES
•
Rapid rinse set at TWO MINUTES
•
Refill set at ZERO
IMPORTANT:
Well pump must be able to provide 7 gpm for
proper backwash. Evaluation required PRIOR to installation.
IMPORTANT:
Disinfection (chemical treatment) is
required if water contains bacteria, iron bacteria or
sulfur bacteria. Site evaluation and testing is advised.