
Aeroball Senior 4 Manual
21 Oak Street, Fakenham, Norfolk - NR21 9DX, www.activeengineeringsystems.com
[email protected] t: +44 01328560250
Step 15:
Fit the four upper horizontal pieces (part #41) at the very top of the structure. Install the T-connector
(part #46) in the very center.
By the end of Step 15, the entire
structure
of the Aeroball should be set up.