![AERMEC VES Instruction Manual Download Page 11](http://html.mh-extra.com/html/aermec/ves/ves_instruction-manual_2862041011.webp)
25
If the hydraulic connections require the
rotation of the coil, then after removal
of the frontal enclosure panel proceed
as follows:
– remove the condensate drain pan (3)
– remove the coil sealing cover (4) undo-
ing the screws
– remove the screws that fix the coil (5)
and extract the coil
– remove the knock-outs (6) of the right
side
– rotate the coil and fix with the screws
previously removed
– WARNING! Before rotating the coil refer
to the coil rotation drawing.
It is important that the coil is correctly
rotated and installed.
Correctly rotate the coil (5) and fix with the
screws previously removed. The spaces
between drain pan and the hole on the
side must be completely filled and closed
with insulating material.
– refit the cover (4) and fix with the screws
– mount the plastic caps (7) supplied
loose into the holes left empty by the
hydraulic connections; all the drain pans
are provided with condensate discharg-
es on both sides.
– remove the electrical connections from
the right side, remove the knock-out and
move the grommet (9) from right to left
– move the electrical connections to the
left side passing through the grommet
(9)
– move the terminal block (10) and the earth
connection (11) to the left side.
ROTATING THE COIL
A
B
1
80°
COIL ROTATION DRAWING
VES040
VES140
VES240
VES340
A
B
1
80°
VES030
VES130
VES230
VES330
Low
High
Low
High
Low
High
Low
High
Low
High
STANDARD
VES 3
V1
V2
V3
V4
V5
V6
V7
L7
L6
L5
L4
L3
L2
L1
Velocità
- Speed - Vitesse- Geschwindigkeit-Velocidad
Collegamento Motore
- Connection to Motor - Connexion à moteur- Verbindung zum Motor - Conexión a Motor