14.  SYSTEM CHARGING

Before commencing the charging procedure position 

the main isolator of the unit in the OFF position.

1. 

 Ensure that the system drain valve is closed

2. 

 Open all the system air vents and of the terminal 

units

3. 

Open the system isolating valves

4.   Start filling slowly opening the system water 

charging valve external to the unit

5. 

 When water exits the terminal units air vents 

close them and continue charging until the 

required system operating pressure is reached.

14.2.  SYSTEM DRAINING

1. 

Before commencing draining the draining proce-

dure position the main isolator of the unit in the 

OFF position

2. 

 Ensure the system water charging valve is closed

3. 

 Open the system drain valve external to the unit 

and all the system air vents and of the terminal 

units.

14.5.  UNIT DRAINING

WARNING

 

During the winter period the water in the heat 

exchanger may freeze when the system is off, causing 

irreversible damage to the heat exchanger.

There are three solutions to avoid the risk of freezing

1. 

Complete draining of water from the unit.

2. 

Operating with glycol,  with a percentage of glycol 

selected in accordance with the minimum antici-

pated external temperature. 

3. 

Use of electric heaters. 

 

In such cases the electric heaters must always have 

power available for the whole period of possible 

freezing (unit in stand-by)

WARNING

Confirm the hydraulic integrity of 

the joints. 

WARNING

It is recommended to repeat 

this procedure after the unit has 

operated for a few hours and to 

periodically check the system pres-

sure. Charging to be done with unit 

off (pump OFF).

WARNING

 

If the system contains and anti-

freeze this must not be discharged 

to the drains as the liquid may be 

a pollutant. 

It must be recovered and recy-

cled.

Summary of Contents for Variable Multi Flow ANL 290

Page 1: ...BARCODE EN Installation and Maintenance Manual CHILLERS EXTERNAL UNITS HIGH EFFICIENCY ANL 290 650 18 03 5719210_03...

Page 2: ...es In addition the applied mark guarantees that our appliances fully comply with the safety requirements defined by the applicable product s rules We constantly monitor the quality level and as a resu...

Page 3: ...EN 60335 2 40 A2 2009 CEI EN 55014 1 2017 CEI EN 60335 2 40 A13 2012 CEI EN 55014 2 2016 La presente dichiarazione di conformit rilasciata sotto la responsabilit esclusiva del fabbricante This declara...

Page 4: ...7 3 Dimensions ANL 580 620 650 mm 15 7 4 Position of hydraulic connections mm 16 7 5 ANL C 290 300 340 400 mm 17 7 6 ANL C 580 620 650 mm 17 8 Electrical connections 18 8 1 Electrical power supply con...

Page 5: ...h the equipment as this could result in accidents for which the manufacturer will not be held responsible The warranty will be voided if the above mentioned warnings are not respected 1 2 SAFETY INSTR...

Page 6: ...ifting capability of the equipment being used taking into account the information provided with the packaging When lifting insert through the unit s base holes lifting bars NOT PROVIDED of sufficient...

Page 7: ...nnection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping These impurities may otherwise be deposited within the unit and cause a malfunction The co...

Page 8: ...freezing 1 Complete draining of water from the unit 2 Operating with glycol with a percentage of glycol se lected in accordance with the minimum anticipated external temperature 3 Use of electric hea...

Page 9: ...ly sized for the required flow rate The water flow rate through the heat exchanger must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates...

Page 10: ...must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping These impurities ma...

Page 11: ...heat exchanger must always be constant WARNING Carefully clean the system prior to connection to the unit This clean ing eliminates welding slag dirt rust or any other impurities from the piping Thes...

Page 12: ...217 2 28 75 221 6 21 32 164 4 21 76 167 7 VT17 12 0 0 6 ANL 400 L P2 797 754 1049 536 52 805 1080 542 27 56 220 5 28 37 226 9 21 72 173 7 22 35 178 8 VT17 12 0 0 6 ANL 400 L P3 778 735 1032 537 54 788...

Page 13: ...25 1160 1100 800 800 800 1100 3000 A Gy Gx B C D 1610 40 16 16 16 16 40 420 420 2050 200 200 2050 200 200 20 20 1060 7 1 DIMENSIONS ANL 290 300 340 mm 7 1 1 MAXIMUM OVERALL mm 1610 40 16 16 16 16 40 4...

Page 14: ...0 16 16 16 16 40 420 420 2050 200 200 2050 200 200 20 20 1060 7 2 2 LIFTING POINTS mm 16 16 16 16 2050 200 200 2050 200 200 20 20 1060 7 2 3 POSITION ANTI VIBRATION MOUNTS mm 1605 1735 2450 2525 1160...

Page 15: ...IMUM OVERALL mm 1875 3200 3275 2005 1100 1160 800 800 800 1100 3000 40 16 16 16 16 16 16 40 1525 1275 200 200 1525 1275 200 200 Gy Gx 1956 40 16 16 16 16 16 16 40 644 600 1525 1275 200 200 1525 1275 2...

Page 16: ...UT 2 IN 2 195 180 670 ANL 290 300 340 400 VERSION 00 ANL 290 300 340 400 VERSION 01 02 03 04 P1 P2 P3 P4 IN 2 OUT 2 IN 2 OUT 2 205 180 492 205 180 670 IN 2 OUT 2 IN 2 OUT 2 IN 2 OUT 2 205 180 492 195...

Page 17: ...ANL 290 650 EN 7 5 ANL C 290 300 340 400 mm 7 6 ANL C 580 620 650 mm 191 184 152 233 189 183 138 219 A C B D 189 183 138 219 C D A Inlet Intake line 35 B Otlet Liquid line 22 C Inlet Intake line 42 D...

Page 18: ...e below 2 The unit is only powered up on completion of any hydraulic and electrical works 3 Comply with the indicated phasing and earth requirements 4 The power supply cable must have the appropri ate...

Page 19: ...ct functioning of any flow switch installed close the isolating valve on the evaporator outlet and observe the result on the unit display panel open the valve and reset the flow trip alarm 9 3 FIRST S...

Page 20: ...t the control panel is off WARNING For the installation refer to the electrical wiring schematics provide with the unit The electrical wiring schematic and manuals must be carefully conserved and made...

Page 21: ...n and energy efficiency The fundamental required annual checks are 11 1 HYDRAULIC CIRCUIT CHECK 1 Water circuit is filled 2 Water filter is clean 3 Operation of the differential pressure or flow switc...

Page 22: ...vents and of the terminal units 14 5 UNIT DRAINING WARNING During the winter period the water in the heat exchanger may freeze when the system is off causing irreversible damage to the heat exchanger...

Page 23: ...installed PR3 Not installed Go to question 3 Installed Enter in parameter PAN index 9 menu INSTALLER with the appropriate value Value 1 Season selection controlled from the chiller circuit board ON OF...

Page 24: ...ns loose Operating outside of limits Check against operating limits chart Pressostat faulty Replace the component Thermal cut out operates Check voltage and settings Check insulation of windings Compr...

Page 25: ...02 04 P2 P4 9 Liquid sight glass 10 Desuperheater optional 11 Water filter 12 Pump s optional 13 Expansion tank standard with hydronic module 14 Buffer tank optional 15 Flow switch 16 Gauge 17 Air ven...

Page 26: ...nal valve only for versions 02 04 P2 P4 9 Liquid sight glass 10 Desuperheater optional 11 Water filter 12 Pump s optional 13 Expansion tank standard with hydronic module 14 Buffer tank optional 15 Flo...

Page 27: ......

Page 28: ...C S p A Via Roma 996 37040 Bevilacqua VR Italia Tel 39 0442 633111 Fax 39 0442 93577 marketing aermec com www aermec com Aermec reserves the right to make all modification deemed necessary for improvi...

Reviews: