3.7 iany installation of the section with water coil HrS_CS
A plastic bag is also supplied with the section with water coil. It contains:
- n. 4 anti-vibration mounts
- n. 4 attachment brackets
- n. 8 M8 x 20 screws
- n. 4 notched washers diam. 8 mm.
positioning
• The section with water coil must be positioned in front of the machine flow vent.
The collector marked by the "WATER OUTLET" label must be at the side of the machine
(1)
• Remove the side panel of the section with water coil, loosening the screw fasteners
(2)
• Partially tighten the 4 M8 screws into the inserts present at the tops of the machine event
(3)
• Hitch the section with water coil to the machine, passing the head of the projecting screws through the holes and
push the section down, in a way that the head of the screws is blocked in the upper part of the hole. Access the 4
screw fasteners from the side of the section and tighten them
(4)
• Fix the side of the section again
(5)
Ceiling fixture
• Fix the supplied brackets to the section using the 4 M8 screws to be
tightened in the relevant inserts
(6)
• Fix four threaded M8 tie-rods to the ceiling in correspondence with
the brackets. Block the unit by tightening the fixing bolts
(7)
1
2
3
4
5
6
7
Attention: the installation of the section with water coil leads to additional pressure drops
in the introduction circuit. These drops are stated in the table on page 9 (“Coil air side pressure drop”)
page 14
Heat Recovery Units Installation, Use and Maintenance Manual
Summary of Contents for HRS 030
Page 1: ...HEAT RECOVERY UNIT Installation Use and Maintenance Manual HRS HRS W 4530600_00 dated 0904 ...
Page 26: ...Heat Recovery Units Installation Use and Maintenance Manual page 29 ...
Page 27: ...Heat Recovery Units Installation Use and Maintenance Manual page 30 ...
Page 28: ...Heat Recovery Units Installation Use and Maintenance Manual page 31 ...
Page 29: ......