
25
DMH - DMH_C - DMV
EN
MACHINE POSITIONING (RECESSED
VERSION)
• We recommend positioning the
unit at about 15-20 cm from the
ground
• Hydraulic and drainage connections
are located near the gap of the
unit, which allows for rear, side or
bottom connections.
• If the outer casing is supplied, it
must be walled up beforehand in
the recess, leaving the holes to
let the pipes and electrical cables
through on the required side. If
necessary, drill a hole in the wall
to discharge the overall dimensions
of the bush-holder inserts used to
lock the front grid (fig. 1)
ASSEMBLY SEQUENCE
1. Apply the angular fastening ele-
ment supplied with the outer cas-
ing on the side of the machine,
the fixing angle supplied with the
unit.
2. Insert the unit in the outer cas-
ing, locking it at the back via the
angular element by using the
self-drilling screws supplied (fig.
2)
3. E n s u re a l l t h e e l e c t r i ca l
connections pass inside the
machine from the holes under
the control panel and go ahead
with the internal connections
4. Re c o n n e c t t h e e l e c t r i c a l
connectors and lock the door of
the electrical control board to its
panel
5. Centre the covering grid on the
front bushes with the slotted
holes on the grid itself. Lower the
grid until it is fully engaged on
the bushes and bring the bottom
close to the flange of the outer
casing, on which it will be locked
due to the action of a small
magnet (fig.3).
252
661
897
895
660
250
Connessioni elettriche
Connessioni Idrauliche
Scarico condensa
IMPORTANT:
• THE INSTALLATION MUST BE
C A R R I E D O U T I N S I D E T H E
BUILDINGS. PROVIDE FOR ALL
THE NECESSARY HOLES TO
ENSURE THE CHILLED WATER
PIPES, WATER CONDENSATE
D R A I N I N G S Y S T E M A N D
ELECTRIC CABLES CAN PASS.
• LEAVE AT LEAST 150 CM AT
THE FRONT TO ENSURE THE
DEHUMIDIFIED AIR CAN FREELY
CIRCULATE.
Grid locking bush
Electrical connections
Condensate drain
Hydraulic connections
Outer casing
fig. 1
fig. 3
fig. 2
Grid locking bush
Fastening angular element
Compressor
Bush slot
Magnet
Fan