AEQ
AM
‐
03
Self
‐
powered
Stereo
Audio
Monitor
2. POWER
REQUIREMENTS
2.1. General
The description of the front and back panels of the equipment can be found on the
Section 5. Please, unfold the graphic cart to obtain a general view of equipment controls and
its connections.
2.1.1. Connecting the equipment to mains
The
AM-03
is prepared to operate with voltages between 90 to 250V AC without any
previous operation. The unit’s mains connector socket has a fuse box with a 500mA fuse
and a spare fuse.
Note:
The
AM-03
mains cable is delivered with the European normative mains plug and
other with the American normative. In some countries, it could be necessary to replace this
plug with one that complies with the local standards. If this could be your case, please,
replace the plug before operation.
2.1.2. Equipment power on
Once checked and modified, following the instructions in Section 2.1.1., the
equipment is ready to be connect to mains. Before connecting it, please, turn the power
switch to off (fig. 3).
Now turn the power switch on . If all the instructions have been followed properly, the
power on led will illuminate, and the same will happened with the central led of the led audio
phase meter (fig. 4).
The process of preparing and connecting the equipment to mains has finished. Turn
off the power of the unit and proceed with the connection of the audio signals as indicated in
Section 3.
FIGURE 3
FIGURE 4