
4
Gateway
11.2013
1.0 About this Manual
This manual describes important information to follow
during the installation and service of the AEconversion
PLC Gateway. These instructions should always be kept
within reach of the gateway.
Since the documentation is updated frequently, please
visit the AEconversion website (www.AEconversion-
solar.com/downloads) for the latest information.
1.1 Important Safety Information
To ensure the safe installation and service of the
AEconversion Gateway, this manual uses the following
types of safety symbols to indicate dangerous
conditions and important safety instructions that are to
be noted:
WARNING!
This indicates a situation where failure to follow
instructions may be a safety hazard or cause equipment
malfunction. Use extreme caution and follow
instructions carefully.
NOTE:
This indicates information particularly important
for optimal system operation. Follow instructions
closely.
Symbols to be noted:
Direct Current Supply Symbol:
Alternating Current
Supply Symbol:
Safety Instructions:
Before installing the AEconversion Gateway, please read
all instructions and cautionary markings in the technical
documentation about the AEconversion Micro-Inverter
System and the PV monitoring equipment.
CAUTION:
Perform all electrical installations in
accordance with all applicable local electrical codes and
the National Electrical Code (NEC), ANSI/NFPA 70.
Be aware that only qualified personnel should install or
replace AEconversion PLC Gateway.
Do not attempt to repair the AEconversion PLC Gateway;
it contains no user-serviceable parts. Tampering with or
opening the AEconversion PLC Gateway will void the
warranty.
WARNING!
Do NOT disconnect the Gateway from the installation
without first removing AC power.
For damages resulting from failure to follow these
instructions, we assume no liability. When installing the
gateway, please note the following instructions for all
assemblies and components of the system.
In order to ensure faultless and safe operation of
this equipment, proper transport, expert storage,
installation, operation and maintenance is required.
During the operation of this equipment, certain
equipment parts carry hazardous voltages that can
cause serious injury or death. Always follow the
following instructions to minimize the risk of injury or
death.
1.2 Scope
This manual applies to the AEconversion PLC Gateway.
1.3 Target Audience
This manual is for the installer of the products listed in
1.2.
NOTE:
This guide assumes knowledge corresponding to a
recognized professional qualification as an electrician
and only qualified personnel should install or replace
the AEconversion PLC Gateway and the AEconversion
Micro Inverters.
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
THIS MANUAL CONTAINS IMPORTANT INSTRUCTIONS
FOR THE AECONVERSION PLC GATEWAY THAT SHALL BE
FOLLOWED DURING INSTALLATION AND MAINTENANCE
OF THE GATEWAY.
Ground Symbol: