Shield clamp
Cable
Exposed shield
Figure 5‑37. Shield clamp
dASM Commissioning
To ensure optimal functionality of the dASM grid load optimization, make sure to do
the following when commissioning:
• Check the power controller for in-phase grid connection
• Check wiring of patch cables
• Select operating mode TAKT (with the same TAKT cycle period) for all power
controller devices
• Verify these parameters on the master unit:
◦ dASM NO. OF DEVICES
◦ dASM POWER THRESHOLD [W]
• Start up each unit in the dASM group
dASM Notification
The dASM grid load optimization generates the following notifications in the master
unit in the event of an error:
•
dASM device number is incorrect
: Check patch cable connections/
parameter dASM device number
•
dASM power limit has been exceeded
: Reduce setpoints of the
assembly as appropriate
The notifications generated can be reported via:
• Fault log
• LED
• Relay
• Thyro-Touch display
• Thyro-Tool Pro PC software
Advanced Energy
®