
Putting the inner container in the reserve compartment
Lead the reserve V-connection lines up from their stitched attach-
ments on the shoulder supports, then down to the reserve compart-
ment via the opened V-connection channel that runs down the si-
de of the harness. After reserve installation this channel closes by zip
fastener.
To install the reserve first lay the connection lines in the reserve com-
partment followed by the inner container. It is essential that the inner
container is installed with the closure flaps facing downward – towards
the ground in flight. Follow the instructions illustrated on the inner con-
tainer and the inside of the reserve compartment. The silver spots on
container and compartment roof must face each other
. In addition
the reserve handle connection
must lie flat, without twist.
Thread short lengths of packing help lines through the two reserve
compartment white closure loops
.
Caution:
if, after a repack, the reserve does not fit in the inner
container it must be folded again to match the shape of the inner
container.
20