2
Copyright © 2011 ADTRAN, Inc. All Rights Reserved.
Quick Start Guide, 61200825G1-13A, February 2011
3
Figure 1. Installing the PoE Module
Before touching electronic components, make sure you are properly
grounded. By wearing a wrist strap (or using some other type of static
control device), you can prevent static electricity stored on your body or
clothing from damaging your installation.
W
ALL
M
OUNTING
THE
P
O
E P
OWER
S
UPPLY
(O
PTIONAL
)
1.
Decide on a location for the power supply. Keep in mind that the power supply needs to be
mounted close enough to the NetVanta unit for the cords to reach the receptacles.
2.
Prepare the mounting surface by attaching a board (typically plywood, 3/4-inch to 1-inch
thick) to a wall stud (see
Important! Mounting to a stud ensures stability. Using sheetrock anchors may not
provide sufficient long-term stability.
3.
Install two #8 PAN head screws (1-inch or greater in length) wood screws into the mounted
board, following these guidelines:
• Mark the exact positioning of the screws by using the keyhole slots on the sides of the
unit as a template.
• Screws should be horizontally level with each other.
• Leave approximately 1/4-inch of the screws protruding from the board to allow the heads
of the screws to slide into place in the unit’s keyhole slots.
4.
Insert the screws through the keyhole slots in both sides of the unit and slide the slot
securely onto the screws.
5.
Proceed to the steps given in
Powering the NetVanta and PoE Switchports.
Figure 2. Wall Mounting the Power Supply