OPD9000 series
−
Instruction manual v1.0
18
© ads-tec Industrial IT GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany
4.5 Device installation – Sequence
1. Depending on the orientation of the device, loosen, for
example, the left and right clamp by turning the clamping
screws clockwise (5 mm hex socket).
The clamps will protrude slightly from the housing due to
spring pressure.
2. Press the loosened clamps in, and insert the device into the
wall recess from the front.
3. Once the device is in place, the spring tension should
cause the clamps to snap over the inner edge of the wall
recess.
4. If necessary, also loosen the remaining clamps.
5. Make sure that all clamps are fully in contact with the rear
side of the recess.
6. Tighten the clamping screws, turning alternately by uniform
increments in a clockwise direction (max. 4 Nm).