Industrial PCs OPC7008
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
15
3.4
O
RDER OF INSTALLATION
I
NTEGRATING THE DEVICE IN AN INSTALLATION RECESS
1)
Before the device can be integrated in the panel, the tensioner fixing screws must be
loosened until the tensioners open.
(Item 1 - item 2).
Note:
Tensioners can be opened by using an Allen key of 3mm size.