Voron 2.4 Conveyor 90 Belt Kit assembly manual
P a g e
15 | 27
Belt motor installation
: On the LEFT FRONT side of machine, take the
Timing Pulley 60T,
bore 12mm GT2
and insert it on the end of the REAR ROLLER, then using the original Y
motor and pulley (using M4x8mm Screws and M4 slot nuts), proceed to install it. At this
point place the
GT2 Timing Belt Closed Loop
and align both pulleys, then adjust the
motor bracket in order to tension the closed loop belt. As shown in the next picture:
Figure 24 Insert included Nema 17, using M3x6 screws, don’t tight them yet
Figure 25 GT2 closed belt + 60T GT2 Pulley and 20T GT2 Pulley, tension and adjust motor screws