INSTALLATION
16
AAB-X22/X2
430-2410-021-EN-11
Mounting the AAB-X22/X2
1
Depending on the underground, drill mounting holes for sufficiently dimensioned screws
and/or wall plugs (4x) (see drilling plan)
2
Press in wall plugs
3
Open enclosure cover
4
Insert sufficiently dimensioned mounting screws through the tightening channels of the
enclosure screws in the enclosure base so that the screws protrude from the rear side
of the enclosure (4x)
5
Place the enclosure base with the screws onto the mounting holes with wall plugs
6
Tighten the screws (4x)
7
If wiring is not completed immediately, close the enclosure cover.
Disassembly
►
Carry out disassembly in reverse order
Summary of Contents for AAB-X2
Page 28: ......