SECTION 11: O
PERATION AND
M
AINTENANCE
29 of 55
Figure 14: Automatic Burner Control Sequence
Figure 15: Single Stage Gas Valve for Models UHD[X][S][R] 150 – 400
Burner Sequence for Ignition Control
Flame Signal
Start Gas Valve
Ignition Spark
Thermostat 24 V
SHUT DOWN
RUN
START
ts = 10 Seconds
Signals Output By Control
Required Incoming Signals
Flue Blower
Pressure
Switch
P
C
NO
NC
30 Seconds Purge*
*Purge time begins at pressure switch change over.
30 Seconds Post
If at any stage the flame fails, the control will retry
for ignition. The control has four trials for ignition
before a one hour lockout.
½PSI
IN
C
ON
OFF
Regulator
Outlet
Pressure
Gas Inlet
Inlet Pressure
TOP VIEW
END VIEW
Description
Part Number
Gas Valve 150 - 250 NG
90032505
Gas Valve 150 - 250 LP
90032506
Gas Valve 300 - 400 NG
90032520
Gas Valve 300 - 400 LP
90032521
Summary of Contents for UHD150
Page 2: ......
Page 4: ......
Page 8: ......
Page 27: ...SECTION 9 GAS PIPING 19 of 55 Figure 13 Gas Connection...
Page 47: ...SECTION 14 TROUBLESHOOTING 39 of 55 14 1 General...
Page 62: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 54 of 55...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......