UHA S
TANDARD
U
NIT
H
EATER
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
28 of 49
11.2 Be
g
in Start-Up
11.2.1 Before Operatin
g
the Heater
To ens
u
re that all the controls are in safe
w
orking
order, operate the heater for the first time
w
ith the
isolating gas valve t
u
rned off and po
w
er s
u
pply
t
u
rned on.
1. T
u
rn off the isolating gas valve.
2. T
u
rn
u
p the thermostat a
b
ove room
temperat
u
re. The a
u
tomatic ignition
seq
u
ence
w
ill no
w
b
egin as descri
b
ed
on Page 28, Figure 13
.
There
w
ill
b
e no ignition of the
bu
rner and locko
u
t
w
ill occ
u
r,
w
hich proves the controls are operating
correctly.
Fi
g
ure 13: Automatic Burner Control Se
q
uence
Burner Se
q
uence for Ignition Control
Flame Signal
Start Gas
V
al
v
e
Ignition Spark
Thermostat 24
V
SHUT DO
WN
RU
N
START
ts = 10 Seconds
Signals Output By Control
Re
q
uired Incoming Signals
Flue Blower
Pressure
Switch
P
C
N
O
N
C
30 Seconds Purge*
*Purge time begins at pressure switch change o
v
er.
Axial Fan
30 Seconds Delay
90 Seconds Delay
30 Seconds Post Purge
If at any stage the flame fails, the control
w
ill retry
for ignition. The control has fo
u
r trials for ignition
b
efore a one ho
u
r locko
u
t.
Summary of Contents for UHA 150
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 44: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 36 of 49 14 1 General...
Page 55: ...SECTION 16 SPECIFICATIONS 47 of 49 SECTION 16 SPECIFICATIONS 16 1 Dimension Data...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......