background image

ADCP-96-123 • Issue 1 • May 2007

Page 5

© 2007, ADC Telecommunications, Inc.

A template is provided with the cabinet isolation gasket. The template may be used to determine
the cable conduit locations. Place the template over the top of the PMF and align the top right
corner of the template with the top right corner of the PMF as shown in 

Figure 3

. The holes

punched in the template show the locations for the conduit within the PMF. 

Figure 3. Using the Template To Determine Duct Location Within the PMF

4

CONCRETE PAD CONSTRUCTION

Use the following procedure to construct the concrete pad:

1. Build a wood form for the concrete pad using 2 x 6 framing lumber as shown in 

Figure 4

2. Locate the PMF using the dimensions provided in the construction diagram (see 

Figure 2

).

When installed, the top surface of the PMF must be flush and level with the top of the
concrete pad. 

3. Place reinforcing material inside the form but outside of the PMF.

Note: 

Use temporary top framing to keep the top surface of the PMF flush and level with

the top of the concrete pad (see 

Figure 4

) while the concrete is poured. 

ALIGN EDGES OF 

TEMPLATE WITH 

EDGES OF PMF

CUT-OUT INDICATES

LOCATION OF FEEDER

CABLE CONDUIT

CUT-OUT INDICATES

LOCATION OF

DISTRIBUTION

CABLE CONDUIT

PLACE CARDBOARD

TEMPLATE OVER

TOP OF PMF

21937-A

FRONT OF

CABINET

Summary of Contents for OmniReach FDH 3000

Page 1: ...EM INSTALLATION 6 6 CUSTOMER INFORMATION AND ASSISTANCE 7 _________________________________________________________________________________________________________ INTRODUCTION This publication descri...

Page 2: ...and are listed in descending order of severity of injury or damage and likelihood of occurrence PAGE IDENTIFIER DESCRIPTION OF CHANGE Original Danger Danger is used to indicate the presence of a hazar...

Page 3: ...ation Depending on the landscaping requirements the top surface of the concrete pad may be located from 0 to 3 inches 7 6 cm above the surrounding grade 3 BASE CONSTRUCTION AND CONDUIT INSTALLATION Pr...

Page 4: ...for the FDH 3000 Small Size Cabinet REINFORCED CONCRETE PAD 6 0 IN 15 2 CM 4 0 IN MIN 10 2 CM GRAVEL OR EQUIVALANT FILL COMPACTED SOIL 21936 A 90 BEND IN DUCT PAD MOUNT FRAME CAST IN PLACE 4 IN DUCT F...

Page 5: ...to construct the concrete pad 1 Build a wood form for the concrete pad using 2 x 6 framing lumber as shown in Figure 4 2 Locate the PMF using the dimensions provided in the construction diagram see F...

Page 6: ...electrical codes Check local codes for grounding system installation use of clamps wire size and any other grounding requirements Typically 6 AWG copper wire is used for the ground wire If the ground...

Page 7: ...123 Issue 1 May 2007 Page 7 Connect the grounding wire to the grounding system Leave sufficient slack in the grounding wire to allow it to be routed into the cabinet after the cabinet is mounted on t...

Page 8: ...cation may be verified at any time by contacting ADC s Technical Assistance Center ADC Telecommunications S PORE PTE LTD 100 Beach Road 18 01 Shaw Towers Singapore 189702 ADC Telecommunications INC PO...

Reviews: