
Confidential
8/11/2008
7.1
Mounting Multi-TRX FlexWave™ nano
When the FlexWave™ nano are to be installed in a Multi-TRX configuration, then
each TRX should be installed in a similar orientation but not closer than 30cm to
each other.
A further specific constraint is that the TIB cables must be <1.5m and a 1.5mm
2
Chassis Bond cable must also be connected between each TRX with a length not
exceeding that of the TIB cable.
7.2
Mounting Multi-TRX 165 FlexWave™ nano
The 165 (EDGE) BTS may be installed in a stacked two-TRX configuration. See Annex
A - Drawing 165#018 for details. The procedure for mounting a stacked two-TRX
configuration is as follows:
•
Fit the first wall bracket to the wall in the desired position
•
Remove the plastic cover from the bottom unit
•
Relocate the TX antenna as illustrated in Annex A
•
Fit the antenna cable (part number 165_072) as illustrated in Annex A
•
Fit the second wall bracket to the bottom unit as illustrated in Annex A
•
Mount the bottom unit on the wall
•
Fit the Ethernet and TIB cables to the bottom unit
•
Fit the skirt (part number 165_028) to the bottom unit
•
Remove the plastic cover from the top unit and attach it to the bottom unit
•
Attach the Ethernet and TIB cables to the top unit
•
Replace the plastic cover on the top unit
© 2008 ADC Telecommunications, Inc.
Page 18