
Confidential
8/11/2008
Figure 9 - TIB Connections
6.5
Chassis Bond Strap – Multi-TRX only
When the FlexWave™ nano is operated in a Multi-TRX configuration, each of the
FlexWave™ nano must be connected together using the supplied chassis bond kit.
To fit the chassis bond strap, remove the FlexWave™ nano from the mounting plate
Using the screw provided, screw the Chassis Bond Strap to the screw on the rear of
the FlexWave™ nano , see Figure 10 or Figure 11.
Chassis
Bond Point
Figure 10 – Chassis Bond Screw Location – 139/140 BTS
Connect the other end of the Chassis Bond lead to the next FlexWave™ nano chassis
bond point in the chain.
© 2008 ADC Telecommunications, Inc.
Page 14