
ADCP-75-210 • Issue 1 • March 2007
Page 47
© 2007, ADC Telecommunications, Inc.
Figure 33. Installing the RF Cables
2.7.4
Installing Pre-Connectorized Indoor/Outdoor Fiber Optic Cable
Fiber optic cable installation consists of routing a pre-connectorized outdoor-rated fiber optic
cable from an external splice enclosure to the NXD RAN cabinet, routing the cable into the
cabinet, and then breaking out the individual fibers for connection. The NXD RAN has a fiber
interface on the front of the Synchronous Interface (SIF) Module in the RAN chassis. The fiber
enters the cabinet on the rear side.
Table 21. RAN Antenna Ports and Antenna Base Ports
LABEL ON RAN
LABEL ON ANTENNA
BAND
GPS
GPS
Global Positioning System (GPS)
PCS-P
PCS-T
PCS primary receive path and transmits from PCS A, B or F
PCS-D
PCS-B
PCS diversity receive path and transmits from PCS D, E or C
CELL/SMR-D
CELL/SMR-D
Cell/SMR primary receive path and transmits from Cell A”/A
CELL/SMR-P
CELL/SMR-P
Cell/SMR diversity receive path and transmits from SMR A or
Cell B/B’
Note:
When building out RANs, connect the quadplexers that will contain the first PCS
bands to the top of the PCS antenna element. On the Phasar antenna, this is marked on the
base PCS-T.
21278-A
GPS
PCS-P
PCS-D
CELL/SMR-P
CELL/SMR-D