L-862S Stop Bar Elevated Light
96A0246 Rev. G
Installation
© ADB Airfield Solutions All Rights Reserved
10
Figure 2:
Base Mounting/Installation
To install the L-867 base, perform the following procedure:
1. See Figure 2. Install the L-867 light base (5) on undisturbed soil. If the soil is unsuitable,
remove soil to an adequate depth and replace with compacted acceptable material.
NOTE: I
n closed duct systems, install in soil conditions with good drainage. Use light
bases having a drain hole to prevent water accumulation.
2. Orient the cable entrance hubs of the base in the proper directions.
3. Level the light base so that the mounting flange surface is level with the finished grade.
4. With the base at the proper orientation and held at proper elevation, place approximately 4
inches (10.16 cm) of concrete backfill (4) around the outside base.
NOTE:
If the concrete backfill is omitted, the earth backfill must be compacted to maintain
proper elevation and orientation of the base.
5. Slope the top of the concrete away from the flange portion of the base so the sloped outer
edges of the concrete are at surface grade.
1. L-862S Stop Bar
4. Base Plate
7. L-830 Transformer
2. Hex Bolt (for Vertical Alignment)
5. L-867 Base
8. L-830 Transformer Secondary Female Plug
3. Locking Hex Nut
6. Four Inches Concrete
Backfill Recommended
9. L-823 Cordset Secondary Male Plug
1
4
5
6
7
8
9
2
3