
© Adam Equipment Company 2019
6
3.3
CONNECTION
This indicator must be connected to a load cell platform and calibrated as necessary to
match the platform and user requirements.
The AE 504 has a connector configured for 4-6 wire load cells. Connect the load
cells/platform to the indicator as shown below. The cable length should be as short as
possible, using a large size wire to minimise errors due to resistance in the leads.
3.3.1 Fixing the cable and the indicator
Thread the cable through the pillar, then insert the pillar into the scale/ platform base,
fasten the fixed screw, then place the cable through the holder. Insert the holder into the
bracket of the indicator. Fix the load cell connector. Adjust the holder for right position, and
then fasten the plastic screw on the display.