![Ada GroundDrill-12 Operating Manual Download Page 9](http://html1.mh-extra.com/html/ada/grounddrill-12/grounddrill-12_operating-manual_2845683009.webp)
Drill - 12
MEASUREMENT FOUNDATION
Ground
Drill - 12
Drill - 12
9
7. Stopping
1. Release throttle to idle speed.
2. Move main switch on/off to OFF.
Note:
When storing for long periods, remove all fuel from the gas tank. Do not leave the gas tank at an angle. The pressure inside the tank
can cause the gas to spill out. The working parts of the engine can get very hot.
8. Daily maintenance
Make sure the engine is off before you begin any maintenance or repairs. To prevent accidental engine start disconnect spark plug cap.
Note:
Check and adjust regularly the engine if you want to achieve high performance of it. Regularly maintenance extends engine life. In
the table below there is a maintenance schedule with regular service periods.
Elements to checkup/ period
Before each use
First month
or 5 Hrs.
Every 3 months
or 25 Hrs.
Every 3 months
or 50 Hrs.
Every 100 Hrs.
Oil
check
*
change
*
Air ilter
check
*
clean
*
*
*
Spark plug
check - clean
*
Fuel tank and ilter
clean
*
Fuel line
check
Every 2 years (Replace if necessary)
Summary of Contents for GroundDrill-12
Page 1: ...Operating manual Ground drill Model GroundDrill 12 Manufacturer Address WWW ADAINSTRUMENTS COM...
Page 17: ...Ground Drill 12 ADAINSTRUMENTS WWW ADAINSTRUMENTS COM...
Page 18: ...GroundDrill 12 Drill 12 1 19 2 19 3 21 4 22 5 22 6 25 7 25 8 25 9 29 10 30 11 30 1 2...
Page 19: ...MEASUREMENT FOUNDATION 19 GroundDrill 12 1 Ground Drill 12 2...
Page 20: ...MEASUREMENT FOUNDATION GroundDrill 12 Drill 12 5 2 3...
Page 24: ...MEASUREMENT FOUNDATION 2 GroundDrill 12 Drill 12 1 2 3 1 2 92 1 ON 2 4 3 4 5 2 1 2 3 4...
Page 25: ...MEASUREMENT FOUNDATION 25 GroundDrill 12 6 1 1 2 7 1 2 OFF 8...
Page 26: ...MEASUREMENT FOUNDATION 26 GroundDrill 12 Drill 12 5 25 50 100 2 1 2 25...
Page 27: ...MEASUREMENT FOUNDATION 27 GroundDrill 12 1 2 3 4 5...
Page 28: ...MEASUREMENT FOUNDATION 28 GroundDrill 12 Drill 12 1 2 F7RTC 1 2 3 4 0 70 0 80...
Page 29: ...MEASUREMENT FOUNDATION 29 GroundDrill 12 5 1 2 1 8 1 4 9 1 2 3 4 5 2 3 6 7...
Page 30: ...MEASUREMENT FOUNDATION 30 GroundDrill 12 1...
Page 31: ...1 2 3 4 5 6 7 8 9 WWW ADAINSTRUMENTS COM info adainstruments com...
Page 34: ...ADA MEASUREMENT FOUNDATION WWW ADAINSTRUMENTS COM...