Cold water
Hot water
Vertical installation
on a wall
Horizontal installation
on a wall
Horizontal installation
on a wall
2
4
2
3
1
1
Figure 1
Figure 2
Vertical installation
on a wall
FILLING THE PRIMARY CIRCUIT (Figure 2)
General remark
•
If the tank is used within a heating system, refer to the heating boiler manual.
1.
Check that the drain valve (
3
) of your primary circuit is tightly closed.
2. Open the stop valves (
1
) and (
2
) of the primary circuit connected to the heating boiler.
3. Open the air bleed valve (
4
) located on the top of the hot water tank.
4. When the air is eliminated, close the air bleed valve (
4
). Make sure the air bleed valve
is tight.
(SL only)
Smart SL-SLEW
: A1007850 - 661Y1700 • F - draft
Starting Up
EN
30
Summary of Contents for Smart SL 100
Page 5: ...ENERGY LABELLING Smart SL SLEW A1007850 661Y1700 F draft Product Information 5 EN...
Page 6: ...Smart SL SLEW A1007850 661Y1700 F draft Product Information RATING PLATE EN 6...
Page 37: ...Smart SL SLEW A1007850 661Y1700 F draft 37 EN...
Page 38: ...Smart SL SLEW A1007850 661Y1700 F draft EN 38...
Page 39: ...Smart SL SLEW A1007850 661Y1700 F draft 39 EN...
Page 40: ......