background image

8

Vent/Combustion Air Equivalent Lengths

-

For all venting applications, PVC/CPVC, AL29-4C®,

SS or Polypropylene, the maximum allowable length

should not exceed those lengths listed in Table 8.

-

For PVC/CPVC or AL29-4C® vent systems reduce the

maximum allowable length for each elbow as follows:
- 3 Feet for every 45º elbow
- 5 feet for every 90º elbow

-

For  polypropylene  vent  systems  reduce  the  maxi-

mum allowable length for each elbow as follows:
- 5 Feet for every 45º elbow
- 10 feet for every 90º elbow

2  Inch  (60  mm)  Vent  Systems  Restrictions  for  the

PRESTIGE 60, 110 & Excellence.

-

Derate the maximum boiler input by 3% when using

the maximum equivalent length of 2 inch (60 mm)

vent piping on Solo 110 & Excellence 110.

-  The 2 inch vent system requires a 1 inch clearance

to combustibles

-

Use long sweep elbow to limit pressure drop and to

avoid excessive vent temperatures.

-

In 2 inch PVC vent applications, the first 7 equivalent

feet of the vent system must utilize CPVC material.

To  avoid  vent  failure  the  installer  must  use  CPVC

vent material for the first 7 equivalent feet of a 2 inch

PVC  vent  system.  The  installer  must  also  utilize

primer and glue that is certified for both PVC/CPVC

materials. Failure to properly install the vent system

can lead to carbon monoxide posoning or fire due to

joint separtion or pipe breakage.

WARNING

3 Inch Vent System Restrictions 

-

Derate the maximum boiler input of the PRESTIGE

Solo 250 by 3% when using the maximum equiva-

lent length of 3 inch (80 mm) vent piping.

Rigid Polypropylene Vent System Restrictions

Contact  approved  polypropylene  vent  manufacturer

for  a  copy  of  their  installation  instructions.    Read,

understand and follow all of the vent manufacturer’s

instructions  before  beginning  the  installation.

Contact vent manufacturer if you require any techni-

cal support.  Failure to properly install and support

vent system can lead to carbon monoxide poisoning

or fire due to joint separation or pipe breakage.

-

Rigid polypropylene vent pipe must be installed with

locking  band  clamps  or  connector  rings  and  sup-

ports  (wall  strap  or  clamp,  elbow  or  base,  etc.).

Consult vent manufacturer for complete list of other

parts required.

-

Maintain 5/8" per foot slope back toward appliance

on all horizontal runs.

-

The  use  of  a  wall  plate  is  required  to  seal  rigid

polypropylene vent pipe at the entrance of the chim-

ney or chase to prevent mortar or cement from con-

tacting the polypropylene vent pipe.

-

Any termination piping external to the building must

be UV resistant (black).

-

Do  not  apply  insulation  directly  to  vent.    Maintain

vent manufacturers clearances to combustibles.

-

Plastic venting systems shall not pass through rated

fire  separations  without  approved  fire  stopping

installed in accordance with fire stopping manufac-

turers instructions.

-

Prior to assembly of any joints, ensure joint gasket is

present and properly installed.  Contact vent manufac-

turer  if  gasket  is  missing  or  damaged.    Verify  the

integrity of joints upon completion of the vent system. 

WARNING

Pre-Installation Requirements

TABLE 8

Summary of Contents for Prestige CPVC

Page 1: ...ended to follow the procedures in the steps given skipping or missing procedural steps could result in severe personal injury death or sub stantial property damage The installation must conform to the...

Page 2: ...rough the Roof 13 14 Direct Vent Multiple Boiler Installation Through the Roof 15 Direct Vent Horizontal Sidewall 16 19 Direct Vent Vent Installation Sidewall 20 21 Direct Vent Multiple Boiler Install...

Page 3: ...ir Option for Multiple Prestige Boilers 36 Equivalent Length of Combustion Air Manifold 36 Horizontal Termination 36 Installation Guidelines 36 Transition Boiler Air Piping to Manifold Guidelines 36 S...

Page 4: ...al for additional information Ensure this document and all pertaining documents are kept near the boiler to be used by the qualified heating contractor or service technician for future reference WARNI...

Page 5: ...ted to the common venting system are located and other spaces of the building Turn on clothes dryers and any appliance not connected to the common venting system Turn on any exhaust fans such as range...

Page 6: ...ESTIGE requires a Category IV venting system which is designed for pressurized venting and condensate The vent and combustion air materials piping fit tings and cement must meet the listed require men...

Page 7: ...all 45 Elbow Termination 9311TERM 300130 300186 2SVSTEX0345 3 Side Wall Tee Termination 9390TEE 300311 2SVSTTF03 3 to 4 Vent Adapter 9401PVC3 FSA ULT3 2SVSTTA04 4 Vent Adapter 9401PVC FSA ULT4 SVSTTA0...

Page 8: ...rap or Support Clamp IASC02 2PPS WSM galvanized 2PPS WSM SS stainless steel 2 60mm Wall Plate IAWP02B black 22 60mm PPS WPB black TABLE 2 Description Approved 3 80 mm Rigid Polypropylene Vent Adapters...

Page 9: ...UV Resistant ISELL0487UV 4PPS E90B or 4PPS E90EB 4 100mm Bird Guard Screen UV Resistant IASPP04 4PPS BG 4 100mm Locking Band Clamp or Connector Ring IANS04 4PPS LBC 4 100mm Wall Strap or Support Clam...

Page 10: ...or Cover End Pipe UV Resistant ISCP03 IFEP03 3PPS FCT TABLE 6 Description Approved 4 100 mm Flex Polypropylene Vent Adapters Terminations and Supports Centrotherm Eco Systems LLC Muelink and Grol B V...

Page 11: ...y 3 when using the maximum equiva lent length of 3 inch 80 mm vent piping Rigid Polypropylene Vent System Restrictions Contact approved polypropylene vent manufacturer for a copy of their installation...

Page 12: ...Verify the integrity of joints upon completion of the vent system Pre Installation Requirements Flex Polypropylene Vent System Restrictions 3 Flex venting is limited up to the PRESTIGE Solo 175 2 Flex...

Page 13: ...read the information listed below If contam inating chemicals are located near the area of the combustion air inlet the installer should pipe the combustion air inlet to an outside area free of these...

Page 14: ...mining the total length of pipe 2 The combustion air piping must terminate in an upside down U shape fashion using two 90 elbows as shown in Fig 1 page 12 or with a tee as shown in Fig 2 page 12 The t...

Page 15: ...ove Combustion Air Inlet Combustion Air Termination Direct Vent Vertical Termination of Vent and Combustion Air Piping Fig 1 Vent Termination Combustion Air Termination 12 Min 30 5cm RadialDistance 12...

Page 16: ...using two 90 elbows as shown in Fig 1 page 12 or with a tee as shown in Fig 2 on page 12 3 The vent piping must terminate vertically with a cou pling as shown in Figs 1 2 page 12 Do not extend the ven...

Page 17: ...ust install the factory supplied bird screens on the vent and combustion air termina tions NOTICE Combustion Air Termination Bird Screen Vertical Combustion Air Bird Screen Installation with 90 Elbow...

Page 18: ...the vent and combustion air piping as described in this manual 2 The roof penetration of the vent and combustion air piping should be such that the combustion air inlet is a minimum 12 30 5 cm from t...

Page 19: ...nda tions and clarifications WARNING NOTICE BEST PRACTICE BEST PRACTICE NOTICE NOTICE Determine Termination Location Locate the vent and combustion air termination using the following guidelines 1 The...

Page 20: ...0 5 cm 61 cm Direct Vent Sidewall Termination of Vent and Combustion Air Piping Fig 8 12 Min 24 Max 30 5 cm 61 cm From WallTo Center line of Vent 12 30 5 cm Min Above Grade Highest Anticipated Snow Le...

Page 21: ...nt Sidewall Termination of Vent and Combustion Air Piping with 45 Vent Termination Fig 15 24 61 cm From Wall To Center line of Vent 12 30 5 cm Min Above Grade Highest Anticipated Snow Level 12 Min 30...

Page 22: ...nishes g Avoid locations of possible accidental contact of flue vapors with people or pets 6 The vent termination must also maintain the follow ing clearances as shown in Fig 3 page 13 a At least 3 fe...

Page 23: ...8 through 15 pages 17 and 18 4 The installer must comply with all local codes for iso lating the vent pipe as it passes through floors and walls 5 The installer should seal all exterior openings aroun...

Page 24: ...Combustion Air Bird Screen Installation with 90 Elbow Termination Fig 19 Installer must install the factory supplied bird screens on the vent and combustion air inlet termi nations NOTICE Vent Termin...

Page 25: ...tween All Terminations 12 30 5 cm Min Above Grade Highest Anticipated Snow Level Typ Direct Vent Horizontal Termination of Multiple Boilers Fig 20 Direct Vent Multiple Boiler Installation Sidewall 1 O...

Page 26: ...The total length of the vent or combustion air piping must not exceed the limits given in Table 8 on page 8 Do not include the 90 elbow or coupling used to ter minate the combustion air inlet or vent...

Page 27: ...in 4 feet 1 2 m horizontally 6 The edge of the combustion air termination coupling must extend to 1 2 5 cm beyond the exterior wall as shown in Fig 21 page 23 7 Locate the vent termination and combust...

Page 28: ...GE boilers ter minate each vent and combustion air piping as described in this manual 2 Each vent and combustion air termination must be a minimum 12 30 5 cm from the adjacent termina tion for install...

Page 29: ...system there maybe some variations Consult the appropriate vent manufacturer for recommenda tions and clarifications WARNING NOTICE NOTICE NOTICE Determine Termination Location Locate the vent and com...

Page 30: ...Installation Through the Roof 1 Vent Penetration Vent pipe penetration through combustible or non combustible wall material should maintain a minimum 1 4 6 mm clearance for 3 or 4 PVC CPVC vents or 1...

Page 31: ...e Commonwealth of Massachusetts the installer must comply with the additional requirements outlined on pages 37 and 38 A gas vent extending through a sidewall should not terminate near an adjacent wal...

Page 32: ...t the boiler with a 90 elbow 7 Locate the vent termination in a matter to protect from damage by foreign objects such as stones or balls or subject to buildup of leaves or sediment 8 Do not connect an...

Page 33: ...ax 30 5 cm 61 cm To Wall 36 Max 91 4 cm Vent Termination Category IV Sidewall Snorkel Termination of Vent Pipe with 90 Elbow Termination Fig 29 12 Min 24 Max 30 5cm 61cm ToWall 12 30 5 cm Min Above Gr...

Page 34: ...The vent and combustion air terminations must include a factory supplied bird screen installed as shown in Figs 16 through 19 page 21 2 The combustion air piping must terminate at the boil er with a...

Page 35: ...one option for vent terminations of multiple PRESTIGE boilers Any vent termination option shown in Figs 26 through 31 pages 30 and 31 can be used for multiple PRESTIGE boilers The 12 30 5 cm minimum d...

Page 36: ...ke the transition to 2 60 mm Polypropylene vent see Table 2 on page 5 The 2 60 mm vent should not transition back to 3 80 mm vent at any point in the vent system The PVC combustion air piping shall tr...

Page 37: ...t length of 3 80 mm and 4 100 mm combustion air piping combined shall not exceed the length listed for combustion air in Table 8 page 8 Insert Piping to PRESTIGE Adapters 1 The installer must clean de...

Page 38: ...The installer should use perforated metal strap hang ers or equivalent pipe hangers suitable for plastic pipe to support the piping The hangers must be spaced at a maximum of every 5 feet 1 5 m of ho...

Page 39: ...ustion air termination must be a minimum of 3 feet 0 9 m below vertically any appliance vent termination within 10 feet 3 m hor izontally The common combustion air termination must be a minimum of 3 f...

Page 40: ...wer in case of power failure NOTICE NOTICE The carbon monoxide detector and alarm installed within the same room as the direct vent appliance must meet ANSI UL 2034 standards and comply with NFPA 720...

Page 41: ...and alarm shall be installed in the mechanical room in which the direct vent appliance is located The carbon monoxide detector and alarm shall Be either hard wired or battery powered or both The carb...

Page 42: ...Notes...

Page 43: ...Notes...

Page 44: ...lates made of stainless steel with 99 9 copper and brazing ensuring a high resistance to corrosion Self cleaning and self descaling Computerized sizing available from Triangle Tube Phase III Available...

Reviews: