background image

EN • 6

664Y4300.E

E

ngl

is

h

F

R

A

n

Ç

A

is

n

E

D

E

R

l

A

n

D

s

E

s

p

A

ñol

iT

A

l

iA

n

o

D

E

u

T

s

c

h

p

o

l

s

K

i

2

1

5

4

3

6

usE of thE BoilEr

 

Please  get  your  system  serviced  every  year  by  a  qualified 
technician. More frequent servicing may be required depending 
on  boiler  use.  If  this  is  the  case,  consult  your  installer  for 
advice.

 

Starting the burner:

 

In normal operation, the burner starts automatically as soon as 
the boiler drops below the temperature setpoint.

 

Before  the  boiler  is  serviced,  switch  off  the  electrical  supply 
with the external isolator.

 

Also switch the general switch on the control panel to “OFF”.

hEatinG circuit prEssurE

The heating circuit pressure must be at least 1 bar and must be regularly 
checked by the end user. Always make sure that the appliance is off when 
refilling the system. To do this, use the ON/OFF switch. For further information, 
please contact your installer.
A safety valve is provided under the appliance. If the pressure of the installation 
exceeds 3 bars, this valve opens and water from the system is drained off. If this 
happens, please contact your installer.

water from the safety valve may be extremely hot 

and cause very severe burns.

GEttinG to KnoW thE control panEl

1 - Control thermostat
If the boiler is only used for producing hot water, the boiler temperature may 
be adjusted between 60 °C and 90 °C.
If the boiler is used for hot water and heating, the boiler’s control thermostat 
will generally be set to 80 °C for optimum operating conditions.

2 - General switch
This switch is used for starting and shutting down the boiler.

3 - Summer/winter selector
This is used to turn the heating circulator on and off (if connected directly to 
boiler wiring).

4 - Temperature-pressure gauge
This gauge displays the boiler temperature and the pressure inside the primary 
circuit. The temperature should not exceed 90  °C. If it is higher than this, 
the boiler should be shut down and the thermostat settings checked. If the 
problem persists, call a technician. The pressure should not fall below 1 bar. 
If it does, consult the “Heating system pressure” paragraph further on in this 
section.

5 - ACV controller (optional)
Refer to the controller instructions if you have this option.

6 - Manual reset safety thermostat
If the boiler temperature exceeds 103  °C, this safety device will shut down 
the boiler and the overheat warning light will come on. To restart, the boiler 
temperature must fall below 60 °C. Unscrew the cover and press the restart 
button using a pen or a similar pointed object, then replace the cover. If the 
problem persists, turn the boiler off and call a technician.

UsEr GUIDE

Summary of Contents for Delta Pro 25

Page 1: ...EN 1 664Y4300 E English FRAN AIS NEDERLANDS espa ol ITALIANO deutsch POLSKI deltapro pro pack Installation operating and maintenance instructions...

Page 2: ...raining the DHW circuit 24 Spare parts at the end of the instructions Important notes 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Certification 3 Important notes 3 Description 4...

Page 3: ...ted in the factory and cannot be changed in Belgium Before carrying out any work on the boiler it is important to isolate the electrical supply to the unit The user must not attempt to gain access to...

Page 4: ...re drain down valve body fully isolated with rigid polyurethane foam Optional equipment Delta Pro 25 45 Pro Pack 25 45 Balanced flue kit except for Delta Pro 55 Control Unit kit Delta Pro Pack only Se...

Page 5: ...KI 21 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 12 12 12 6 6 6 22 23 7 7 7 8 8 8 9 9 9 10 10 10 11 11 11 13 15 15 15 18 18 18 20 20 20 19 19 19 14 16 16 16 24 17 17 17 1 2 3 4 5 12 6 7 8 9 10 11 15 18 20 19 16 17...

Page 6: ...ermostat If the boiler is only used for producing hot water the boiler temperature may be adjusted between 60 C and 90 C If the boiler is used for hot water and heating the boiler s control thermostat...

Page 7: ...problem persists please contact your installer Starting the burner In normal operation the burner starts automatically as soon as the boiler drops below the temperature setpoint To make sure your syst...

Page 8: ...M 8 for attaching the burner It is protected from heat by a blanket insulation TECHNICAL CHARACTERISTICS General characteristics Delta Pro Pro Pack 25 Delta Pro Pro Pack 45 Delta Pro 55 Input power In...

Page 9: ...F mm G mm H mm I mm J mm K mm L mm M mm Kg Delta Pro 25 1760 540 584 1386 360 200 100 220 1445 1445 928 1400 145 Delta Pro 45 1760 540 584 1386 390 200 100 220 1445 1445 928 1400 168 Delta Pro 55 176...

Page 10: ...uction collar Boiler room ventilation The boiler room must be fitted with top and bottom vents The tables below give the values defined according to Belgian regulations Given that regulations vary fro...

Page 11: ...iler is fitted with an ACV BG 2000 S premix boiler C53 Connection to separate ducts for the supply of combustion air and for venting the combustion products these ducts may end in zones with different...

Page 12: ...EN 12 664Y4300 E English FRAN AIS NEDERLANDS espa ol ITALIANO deutsch POLSKI C83 C33 C43 C43 C13 B23 C53 B23P A B A A A B A B A A A C Installation Flue connection options...

Page 13: ...960 mm C adjustable duct Code Item 537D6202 Length adjustable from 325 to 400 D pipe bends Code Item 537D6203 43 45 bend 537D6204 87 90 bend E Condensation measuring and collection device Code Item SI...

Page 14: ...ted UK regulations apply Hot water safety valve The hot water safety valve is at 7 bar valve discharge must be connected to drain UK regulations apply Hot water expansion tank as standard on Pro Pack...

Page 15: ...y valve as standard 6 Primary expansion tank as standard on Pro Pack 7 Control unit optional 8 Drain down valve as standard Drain valve The safety valves must be connected to the drain Delta Pro Pack...

Page 16: ...ers The DeltaPro ProPack boilers combined with an ACVBG2000 S burner have a 3 4 F gas connection for connection of a gas supply valve The gas connections must comply with all applicable standards in B...

Page 17: ...ide the boiler to allow the power to be shut off during servicing and before any repairs are carried out Compliance The installation must comply with current regulations Safety The hot water circuit m...

Page 18: ...rature measured by a third detector The system provides a high level of comfort as the start temperature is constantly adapted to heating requirements Built in timer with setting of heating times day...

Page 19: ...r Bk G Gr B Bk Y Gr Br B Y Gr M L PE N 23 24 25 26 27 28 29 30 X1 31 32 33 34 35 36 37 38 19 20 21 22 15 16 17 18 11 12 13 14 10 6 7 8 9 2 3 4 5 X2 X4 X2 X1 X4 X3 X3 1 Bus A Bus B Bus A Bus B AF200 VF...

Page 20: ...at all times in such a way as to save energy and release few harmful substances we recommend that you have your burner inspected every year by a specialist company For further information please consu...

Page 21: ...across the venturi tube falls the gas flow rate diminishes the flame extinguishes and the gas valve closes the burner is then in lockout In the event of flue blockage or restriction the air flow rate...

Page 22: ...r 20 mbar 20 mbar G25 25 mbar 25 mbar 25 mbar 25 mbar G30 30 50 mbar 30 50 mbar 30 50 mbar G31 30 50 mbar 37 50 mbar 30 50 mbar 37 50 mbar 30 50 mbar 37 50 mbar 37 mbar BE Belgium CH Switzerland CZ Cz...

Page 23: ...s Ignition electrode Burner RESET Gas connection 3 4 female Ionisation electrode Venturi tube Fan Burner chamber plate insulation Burner chamber plate seal Gas valve Burner chamber plate Flame sight g...

Page 24: ...Take off the top of the Flue reduction B 5 Remove the turbulators C from the flue pipes D for cleaning 6 Remove the burner chamber plate E 7 Brush the flue pipes D 8 Clean the combustion chamber F an...

Page 25: ...EN 25 664Y4300 E English FRAN AIS NEDERLANDS espa ol ITALIANO deutsch POLSKI 8 6 4 3 3 2 1 7 5 4 5 3 11 8 10 6 9 7 5 2 1 B A H E D C F Commissioning and maintenance...

Page 26: ...EN 26 664Y4300 E English FRAN AIS NEDERLANDS espa ol ITALIANO deutsch POLSKI...

Page 27: ...ML 1 S p are Part s 664Y4300 E Delta pro pro pack 25 45 55 54766017 54766016 54441008 54322000 54764009 54764021 54442045...

Page 28: ...ML 2 S p are Part s 664Y4300 E Delta Pro Pro Pack 25 45 21475455 21471455 21478455 21473455 21477455 21476455 21479455 21474455 21471455...

Page 29: ...ML 3 S p are Part s 664Y4300 E Delta Pro 55 21475457 21471455 21477455 21473457 21476455 21479457 21474455 21471455...

Page 30: ...ML 4 S p are Part s 664Y4300 E Delta Pro 25 45 50423365 51401049 2147P455 63438001 49410045 507F3049 557A1500 557A0016 55426017 557A5005 63438001 51305000 507F2005 55426001...

Page 31: ...ML 5 S p are Part s 664Y4300 E Delta Pro 55 50423365 51401049 2147P455 63438001 49410039 507F3049 557A1500 557A0016 55426017 557A5005 63438001 51305000 55426001 507F2010 507F2009 16 x 8 x...

Page 32: ...ML 6 S p are Part s 664Y4300 E Delta Pro Pack 25 45 50423365 51401049 2147P455 63438001 49410045 507F3049 557A0016 63438001 51305000 507F2005...

Page 33: ...ML 7 S p are Part s 664Y4300 E 10800191 Delta Pro Pack 25 45 55426017 557A5005 557A7008 55426001 557A7007 557A1500...

Page 34: ...ML 8 S p are Part s 664Y4300 E...

Page 35: ...ML 9 S p are Part s 664Y4300 E...

Page 36: ...ML 10 S p are Part s 664Y4300 E...

Reviews: