EN • 2
ENGLISH
FRANCAIS
NEDERLANDS
ESP
AÑOL
IT
ALIANO
DEUTSCH
664Y3000.A
WARNING
3
Who should read these instructions
3
Symbols
3
Recommendations
3
Applicable standards
3
Warnings
3
INTRODUCTION
4
Description of the specifications
4
USERS GUIDE
5
Directions for use
5
Settings the parameters
5
TECHNICAL CHARACTERISTICS
6
Natural gas categories
7
Propane gas categories
7
Pressure drop diagram of the boiler
7
ELECTRICAL CONNECTION
8
Wiring diagram
8
INSTALLATION INSTRUCTIONS
9
Dimensions
9
Boiler room
9
Wall mounting of the boiler
9
INSTALLATION
10
Connection to the chimney
10
Connection to the gas
11
Heating connections
11
Installation of simple heating circuit controlled by room thermostat ACV 15
12
Installation of simple heating circuit controlled by Room Unit
13
Installation of two heating circuits controlled by room thermostat ACV 15 and AM3-11 module
14
Installation of two heating circuits controlled by Room Unit and ZMC-1 module
16
Installation of three heating circuits controlled by Control Unit
18
Domestic hot water connection
19
COMMISSIONING AND MAINTENANCE
20
Commissioning the system
20
Inspection and maintenance
20
Disassembling the burner
21
Disassembling and checking the electrode
21
Disassembling the heat exchanger
21
Cleaning the heat exchanger
21
Temperature sensor resistance tables
21
MCBA PARAMETERS FOR THE SPECIALIST
22
Standby Mode
22
Settings the MCBA parameters
23
Request for information on the installation
24
Entering the code
24
MCBA parameters with code restricted access
25
Communication Mode
28
Error Mode
28
Safety stop + resolution of the fault
29
SPARE PARTS
See at the end of this manual
INDEX
Summary of Contents for 75
Page 38: ......