![Acuity Brands HOLOPHANE CORTEZ CZQ2L Manual Download Page 4](http://html1.mh-extra.com/html/acuity-brands/holophane-cortez-czq2l/holophane-cortez-czq2l_manual_2844473004.webp)
FINAL ASSEMBLY
Connect battery and lamp plug to
charger board.
Units with Lamp Wires:
Connectors provided are compatible
from 18 to 10 AWG on unit and the
unit. Use a fine tip flat head
screwdriver to open the connector
jaws.
Install the plastic film to housing.
Connect AC input plug to charger
board.
Housing attachment to mounting
plate:
Make certain all wires and
connectors are routed to avoid
interference with other components.
Align latch openings on underside of
housing with latch buttons on
mounting plate. Firmly push housing
straight onto mounting plate, making
certain all four latches are fully
engaged, and the housing is closely
aligned to the mounting surface.
Federal Communications
Commission (FCC) Requirements:
This device complies with Part 15 of the FCC Rules.
This device may not cause harmful interference.
WIRING DIAGRAM
*
NOTE:
Spare wire should be capped tuck excess wire into junction box
or dress it into the slot of mounting plate as shown in step1, page 2
(Junction Box Mounting).
Input
Voltage
Pin
No.
Wire
color
Wire Label
Remarks
120V
1
White
Neutral
2
Black
Hot 120V
3
Orange
Hot 277V
*Spare Wire
277V
1
White
Neutral
2
Black
Hot 120V
*Spare Wire
3
Orange
Hot 277V
347V
1
White
Neutral
2
Black
Hot 120V
*Spare Wire
3
Orange
Hot 347V
220V-
240V
1
White
Neutral
2
3
Orange
Hot 220V-240V
Battery Type
Total Load
NiCd
– 3S1P
1.6 W
Battery
Lamp
Status Indicator LED
Test Switch
Input from branch circuit. See label on wire
pair for voltage requirements.
NOTE:
Refer table for operating voltages
page 3
INSTALLATION and WIRING (CONTINUED)
4
5
6
Lamp connector
Battery connector
AC connector
Plastic film
PIN 3
PIN 2
PIN 1