background image

Installation should be performed by a qualified 

electrician in accordance with the National Electrical Code 

and relevant local codes.

iNSTALLATiON iNSTRUCTiONS

RHYTHM SERiES

©2014 Acuity Brands Lighting, Inc.

7/29/14

INS-RHYTHM

9144 Deering Avenue | Chatsworth, CA 91311 | www.hydrel.com
Phone: 866.533.9901 | Fax: 866.533.5291

Fixture to SSBR Surface Box Connection

1)  Route fixture cord along fixture and 

Mounting Plate

 

Rod

 (H) and secure with provided 

Wire Keepers 

(I) (J).

2)  Trim excess cord at 

SSBR

, strip back jacket approximately 4”, and slide through 

½” Cord Seal

 (K) provided.

 

a. Note:  

½” Cord Seal 

(K) may be utilized on either side of 

SSBR

 as required by installation.

3)  Make electrical load connections as indicated on the labeled conductors and per all NEC and local code 
 requirements.

SSBR

Mounting Plate Rod

Wire Keepers

Wire Keepers

Cord Seal

H

I

J

K

J

H

I

K

WARNiNG

:

 

FAILURE TO FOLLOW THESE INSTRUCTIONS AND WARNINGS MAY RESULT IN DEATH, INJURY OR SIGNIFICANT PROPERTY DAMAGE

For your protection, read and follow these warnings and instructions carefully before installing this fixture. These instructions do not attempt to cover all installation 
situations. If you do not understand these instructions or additional information is required, contact Hydrel Lighting or your local Hydrel Lighting distributor.

DISCONTINUED

Reviews: