TXV REPLACEMENT - PACKAGE UNIT

  

5

ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice.
Copyright © 2015 Actron Engineering Pty. Ltd.

11. Wrap the whole bulb sensor area with insulation tape. See figure below.

SUCTION PIPE

INSULATION

TAPE

12. Adjust TXV spindle to match ActronAir default settings.

  

Model

TXV Location

Adjustment Settings

Direction

PKY470T

Large Compressor

Open 2 turns.

2

Small Compressor

none

---

PKY500T

Large Compressor

Close 3 turns.

3

Small Compressor

Close 3-1/2 turns.

3

1/2

PKY540T

Large Compressor

Open 2 turns.

2

Small Compressor

Open 2 turns.

2

PKY620T

Large Compressor

Open 2 turns.

2

Small Compressor

Open 2 turns.

2

PKY700T

Large Compressor

Open 2-1/2 turns.

2

1/2

Small Compressor

Open 2 turns.

2

04. Recharging the System / Operation Preparation for Unit Start-Up

1.  Start evacuation process as per ActronAir evacuation procedure.
2.  Re-connect gauges and the cylinder of reclaimed R410a refrigerant as per refrigerant reclaim procedures above.
3.  Recharge the system as per Refrigerant Charging procedures in the Installation and Commissioning Guide. 

 

NOTE

A fresh R-410A refrigerant may be required as a replacement, particularly where there is contamination in the old 
reclaimed refrigerant.

    

4.  Switch back on the power to the unit.
5.  Operate the system and check for system subcooling and superheat. If necessary, add refrigerant charge as per 

procedure detailed in the Refrigerant Charging section of the Installation and Commissioning Guide.