3
Installation Manual
Velcro Pads
Cell Wiring Assembly
Power Wiring Assembly
Ballast Assembly
S/N 9950166
ActivePure Cell
S/N 9950164 - Ozone Free
S/N 9950165 - Ozone
PRODUCT CONTENTS
INSTALLATION STEPS
NOTE:
Unit requires continuous power. We strongly recommend that it is NOT installed where power to the unit
will be cycled on and off.
WARNING
- This unit must be installed by a licensed HVAC contractor. Failure to do so will void warranty
of the product.
1.
Remove film from one side of
Velcro (2 pieces) and attach to
the ActivePure cell as shown.
2.
Remove film from opposite
side of Velcro.