Installation and Commissioning Guide - MultiElite 2 Split System
Doc. No. 9590-5009
Ver. 1 211221
22
Installation and Commissioning Guide
Multi Split System
DIP switch F2: OFF/OFF
Current Running Operation
CN46
Operation
CP
Unit ON
Open
OFF
CP
Closed
No Change
No CP
Unit OFF
Open
No Change
CP
Closed
ON Last
Setting
No CP
DIP switch F2: ON/ON
Current Running Operation
CN46
Operation
CP
Unit ON
Open
OFF
No CP
Closed
No Change
No CP
Unit OFF
Open
No Change
No CP
Closed
ON Auto 24°C
No CP
CP – No Control Operation
No CP – Remote/Wired controller operation
N/O and N/C can be reversed by adjusting DIP switches. See wiring diagram for DIP switch settings.
Wired Controller
Wired controller allows the functions of scheduling on the wall hung split system via connection to multi-function board
CN42 and CN41. See wiring diagram for terminal connection locations.
Alarm Relay Output
Connection terminal CN45 on the multi-function board allows for alarm relay output, this must be 24VAC or DC and
limited to 0.5A max. CN45 Relay will close during any error operation which will cause the unit to stop or during OFF
operation. See wiring diagram for terminal connection locations.