4
actigraphcorp.com
Pair the CP Data Hub with the ActiGraph Link
Follow the instructions in the
CentrePoint User Manual
or your custom Site Manual to assign the ActiGraph
Link activity monitor to a new subject in CentrePoint. After the assignment is complete, remove the Link from
the dock (connected to your PC).
Connect the adapter end of the power cable into the back of the CP Data Hub and plug the other end into a
wall outlet, using the international adapter if necessary.
The blue LED status light on the back of the CP Data Hub will flash during startup. It may take up to 20
seconds for the LED to begin to flash. Once the CP Data Hub connects to the cellular network, the blue LED
will stay on solid.
Connect the Link dock to the USB port on the CP Data Hub using the USB cable.
Insert the Link into the dock connected to the CP Data Hub. Once connected, a progress wheel will appear
on the Link screen indicating that data upload has begun. A checkmark will appear on the Link screen when
this is complete.
Assigning the CentrePoint Data Hub to a Subject
1
1
2
3
4
5
Power
Status Light
USB Port