Assembly Procedure

4

  

Step 1: Connect two, 4 rung frames together. Check

the interlock clips are engaged and add onto the base 

unit, repeat for the other side.

Step 2: Position BoSS Cam-Lock Guardrail unit. The top 

hooks should locate on the 7th rung from base level.

Step 3: Engage Cam-Locks as shown to lock guardrail unit 

in position.

Assembly Procedure

Fit stabilisers to tower before extending telescopic leg. 

Position top clamp above rung 6, second clamp locates 

above rung 2. Extend telescopic leg by removing the 

interlock clip - slide the leg out until the leg reaches the 

ground. Rotate the leg until the interlock clip holes line 

up. Lock the leg by using the interlock clip and adjust the 

stabiliser to ensure the stabililsers are engaged.

5

Summary of Contents for BoSS SOLO 700

Page 1: ...www actavo com BoSS SOLO700 One Man Aluminium Tower 3T Through the Trapdoor Method...

Page 2: ...ES The BoSS Clima aluminium system has been tested and certi ed to EN 1004 2004 Class 3 Instruction Manual EN 1298 IM EN PREPARATION AND INSPECTION Inspect the equipment before use to ensure that it i...

Page 3: ...and set the adjustable legs as required Do not move the tower in wind speeds over 7 7 metres per second 17mph Safety First DURING USE Beware of high winds in exposed gusty or medium breeze conditions...

Page 4: ...very 4 metres in height For further information on tying in a tower please contact your supplier or BoSS MAINTENANCE STORAGE TRANSPORT All components and their parts should be regularly inspected to i...

Page 5: ...DE FREEPHONE 0800 214 005 Ensure all brace claws cam locks and adjustable legs operate correctly Ensure castors rotate freely and brakes lock Re inspect the tower every seven days or less Quantity Sch...

Page 6: ...s and for storage of materials EN 1004 requires platforms at least every 4 2m and these measures will exceed that requirement If the tower is to be used with two people SP10 s stabaliser must be tted...

Page 7: ...t a single person can safely build the platform tower to a platform height of 4 2m 1 Insert castor into adjustable leg apply brake by pushing the lever down release frame interlock clips and t the leg...

Page 8: ...h rung from base level Step 3 Engage Cam Locks as shown to lock guardrail unit in position Assembly Procedure Fit stabilisers to tower before extending telescopic leg Position top clamp above rung 6 s...

Page 9: ...and 4th rung above the platform deck Repeat with second Cam Lock guardrail frame on the front of tower to fully secure platform Engage and lock Cam Lock claws Do not climb onto the platform until it i...

Page 10: ...Assembly Procedure 12 Place the trapdoor deck onto the 16th rung of the wer and engage windlocks Climb the end frame from within and from the protected trap door position t the Cam Lock Guardrails as...

Page 11: ...atform Move Assembly Brackets to base of the tower and t to the lowest rungs of the end frames Dismantling Procedure 14 Simply follow the assembly steps in reverse ensure that the 3T method is followe...

Page 12: ...on the inside of the folding base unit end frames Assembly Procedure 3 Place the Cam lock frames 3 at either end within the trolley Ensure the diagonal struts of the Camlock frames t between the arms...

Page 13: ...e St Michaels Close Aylesford ME20 7XE Tel 01622 794 450 kent hire actavo com East London Bow Unit 3 Primrose Works 10 Stour Road Bow London E3 2NT Tel 0208 533 7333 bow hire actavo com South London S...

Reviews: