 USER GUIDE

FREEPHONE: 0800 214 005

Assembly Procedure

To comply with the ‘Work at Height Regulations’ we 

show assembly procedures with platforms every 2 

metres in height and the locating of guardrails in 

advance of climbing onto a platform to increase safety 

and reduce the risk of a fall.

Never stand on an unguarded platform positioned above    

the first rung of a tower. If your risk assessment shows 

it necessary, you may also need to guardrail platforms 

at this level.

The pro

c

edure illustr

a

ted sho

w

6

.2

m

 

working

 height to

w

er

The BoSS Solo system has been developed so that a single 

person can safely build the platform tower to a platform height of 

4.2m.

1

 

 

Insert castor into adjustable leg, apply brake by pushing the

lever down, release frame interlock clips and fit the leg and castor 
assembly into a 1m base frame. Repeat with the remaining legs 
and castors. Adjustable legs should only be used for levelling.

Assembly Procedure

   Release brakes on castors at one end frame until the

locks will engage on the rear folding frame. Ensure both 

hinges positively lock into position. Engage brakes on 

second frame.

3

    Locate the horizontal brace on the lowest rung with the

hooks facing downwards - check the brace is correctly locked on 

the tube at both ends. Check the base unit is square and level 

using a spirit level. Adjust legs only to level and not to gain 

additional height.

Summary of Contents for BoSS SOLO 700

Page 1: ...www actavo com BoSS SOLO700 One Man Aluminium Tower 3T Through the Trapdoor Method...

Page 2: ...ES The BoSS Clima aluminium system has been tested and certi ed to EN 1004 2004 Class 3 Instruction Manual EN 1298 IM EN PREPARATION AND INSPECTION Inspect the equipment before use to ensure that it i...

Page 3: ...and set the adjustable legs as required Do not move the tower in wind speeds over 7 7 metres per second 17mph Safety First DURING USE Beware of high winds in exposed gusty or medium breeze conditions...

Page 4: ...very 4 metres in height For further information on tying in a tower please contact your supplier or BoSS MAINTENANCE STORAGE TRANSPORT All components and their parts should be regularly inspected to i...

Page 5: ...DE FREEPHONE 0800 214 005 Ensure all brace claws cam locks and adjustable legs operate correctly Ensure castors rotate freely and brakes lock Re inspect the tower every seven days or less Quantity Sch...

Page 6: ...s and for storage of materials EN 1004 requires platforms at least every 4 2m and these measures will exceed that requirement If the tower is to be used with two people SP10 s stabaliser must be tted...

Page 7: ...t a single person can safely build the platform tower to a platform height of 4 2m 1 Insert castor into adjustable leg apply brake by pushing the lever down release frame interlock clips and t the leg...

Page 8: ...h rung from base level Step 3 Engage Cam Locks as shown to lock guardrail unit in position Assembly Procedure Fit stabilisers to tower before extending telescopic leg Position top clamp above rung 6 s...

Page 9: ...and 4th rung above the platform deck Repeat with second Cam Lock guardrail frame on the front of tower to fully secure platform Engage and lock Cam Lock claws Do not climb onto the platform until it i...

Page 10: ...Assembly Procedure 12 Place the trapdoor deck onto the 16th rung of the wer and engage windlocks Climb the end frame from within and from the protected trap door position t the Cam Lock Guardrails as...

Page 11: ...atform Move Assembly Brackets to base of the tower and t to the lowest rungs of the end frames Dismantling Procedure 14 Simply follow the assembly steps in reverse ensure that the 3T method is followe...

Page 12: ...on the inside of the folding base unit end frames Assembly Procedure 3 Place the Cam lock frames 3 at either end within the trolley Ensure the diagonal struts of the Camlock frames t between the arms...

Page 13: ...e St Michaels Close Aylesford ME20 7XE Tel 01622 794 450 kent hire actavo com East London Bow Unit 3 Primrose Works 10 Stour Road Bow London E3 2NT Tel 0208 533 7333 bow hire actavo com South London S...