
720-00003.8
4
CAUTION: DO NOT CUT THE TEMPERATURE SENSE WIRE.
This wire
has a thermocouple integrated into the lug and is used to measure
battery temperature. Cutting this wire will result in erroneous
temperature readings.
CAUTION:
BATTview accessories including any probe option are
not intended for field replacement.
1.
Physical Installation Procedure:
Ø
Always use the correct size drill bit and inserts to connect BATTview leads. Apply
Dielectric grease to the holes and inserts.
Ø
When the BATTview is installed on batteries that could be charged with EnerSys
Enforcer, Hawker LifePlus, or Ametek Eclipse II Chargers, ensure the PLC is disabled
on the BATTview Settings.
Ø
Clean any corrosion on the connector using a small wire brush and a mixture of baking
soda and water.
Ø
Apply a small amount of dielectric grease to the surfaces of intercell terminals before
connecting the BATTview terminal. The grease will help stop future corrosion while
allowing the electricity to make contact through it.
Hall-effect Current Sense Installation:
Using the reference picture below, open the Hall-effect sensor by unscrewing the side screw.
Install the Hall-effect on the negative battery cable, making sure that the arrow is pointing out of
the battery negative terminal. Close the Hall-effect and tighten the screw. Use a zip tie to secure
the cable as shown in the picture.