background image

INSTALLATION, OPERATION

& MAINTENANCE MANUAL

NEO-METRO FIELD SERVICE

TOLL FREE

LOCAL

FAX

800-743-8259 •

626-855-4866 •

626-855-4863

Date: 01/31/22

Part #: 0696-001-001

Page

of 4

4

1. Allow the Rough Wall material with a gap of

approximately 1/2” (Do not allow Rough
Wall Material to overlap Tiling Flange)

2. Let Finished Wall (Tile, etc.) overlap and

rest on shoulder.

RECOMMENDED INSTALLATION  FOR
MODEL WITH TILING FLANGE OPTIONS:

NOTE:

Neo-Metro assumes no responsibility

for problems due to faulty installation or
inadequate floor support.

1

1

1

1

5

STEP 1:

1

2

"

1

2

"

LATH / PLASTER
BOARD, ETC.

MATERIAL (Tile, etc.)

FINISHED WALL

STEP 2:

DO NOT NAIL OR SCREW
FLANGE TO WALL

Reviews: