Page 4 of 6
4. Insert Tubing Adapter
3
onto the end of the
Tubing
4
,
a. For -CU sweat Adapter
3
to Tube
6. Slowly turn on supplies, check for leaks and
tighten Hex Nut
2
if needed.
1. Locate mixing valve
1
in a suitable place
accessible for servicing and adjusting. Valve
should be as close as possible to point of use.
2. Thoroughly flush supplies.
3. Slide Brass Nut
2
, onto supply and outlet
Tubing.
b. For -CPVC Glue Adapter
3
to end of tubing
using appropriate PVC Pipe Cement.
5. Insert Gasket
5
between Valve body
1
and
Adapter
3
then tighten Hex Nut
2
.
INSTALLATION: ST7017-CU & -CPVC
Acorn Controls
Division of Acorn Engineering Company
®
, A member of Morris Group International
™
ST7017 Installation & Operation Manual
Manual #7802-127-001
Date: 07/20/2020
Detail - A
Detail - B
TEMPERATURE ADJUSTMENT:
2. Turn on fixture so temperature can stabilize.
4. Tighten locknut
7
to prevent any unauthorized
or accidental temperature adjustment.
1. Using 5/8”
6
Wrench loosen Locknut
7
.
Detail A
3. Using an 1/8” Allen Wrench
8
, turn adjustment
stem
9
counter-clockwise for hotter or
clockwise for colder outlet temperature.
Detail B
5. Turn on fixture(s) and re-check temperature.
2
3
4
1
7
6
8
9
5