background image

 

Page 4 of 6

4.  Insert Tubing Adapter 

onto the end of the

  Tubing 

4

,

    a. For -CU sweat Adapter 

3

 to Tube

6.  Slowly turn on supplies, check for leaks and

  tighten Hex Nut 

2

 if needed. 

1.  Locate mixing valve 

1

 in a suitable place

  accessible for servicing and adjusting. Valve
  should be as close as possible to point of use. 
2.  Thoroughly flush supplies. 
3.  Slide Brass Nut 

2

, onto supply and outlet

  Tubing.

 

  b. For -CPVC Glue Adapter 

3

 to end of tubing

        using appropriate PVC Pipe Cement.

5.  Insert Gasket 

5

 between Valve body 

1

 and

  Adapter 

3

 then tighten Hex Nut 

2

.

INSTALLATION: ST7017-CU & -CPVC

Acorn Controls 

Division of Acorn Engineering Company

®

, A member of Morris Group International

ST7017 Installation & Operation Manual

Manual #7802-127-001

Date: 07/20/2020

Detail - A

Detail - B

TEMPERATURE ADJUSTMENT:

2.  Turn on fixture so temperature can stabilize.

4.  Tighten locknut 

7

 to prevent any unauthorized

  or accidental temperature adjustment.

1.  Using 5/8” 

6

 Wrench loosen Locknut 

7

 

Detail A

3.  Using an 1/8” Allen Wrench 

8

, turn adjustment

  stem

 9

 counter-clockwise for hotter or

  clockwise for colder outlet temperature. 

Detail B

 

5.  Turn on fixture(s) and re-check temperature.

2

3

4

1

7

6

8

9

5

Summary of Contents for CONTROLS ST7017

Page 1: ...n damaged by other causes such as mishandling or improper care or abnormal use The repair or replacement of the defective materials shall constitute the sole remedy of the Buyer and the sole remedy of Acorn under this warranty Acorn shall not be liable under any circumstances for incidental consequential or direct charges caused by defects in materials or any delay in the repair or replacement the...

Page 2: ...e shall be in accordance with Uniform Plumbing Code TO ENSURE ACCURATE AND RELIABLE OPERATION OF THIS PRODUCT IT IS ESSENTIAL TO Ÿ Properly design the system to minimize pressure and temperature variations You are required to thoroughly read all installation instructions and product safety information before beginning the installation of this product Ÿ Flush supply lines of all foreign material su...

Page 3: ...trols Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 ADJUSTING STEM LOCKNUT 21 2 64 53 8 137 37 8 96 13 4 45 ST7017 34CPVC SHOWN DETAIL NOT TO SCALE GASKET ADAPTER 1 5 8 HEX NUT ...

Page 4: ...Gasket 5 between Valve body 1 and Adapter 3 then tighten Hex Nut 2 INSTALLATION ST7017 CU CPVC Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 Detail A Detail B TEMPERATURE ADJUSTMENT 2 Turn on fixture so temperature can stabilize 4 Tighten locknut 7 to prevent any unauthorized or a...

Page 5: ...use 2 Thoroughly flush supplies Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 INSTALLATION ST7017 PEX TEMPERATURE ADJUSTMENT 3 Using an 1 8 Allen Wrench 9 turn Adjustment Stem 10 counter clockwise for hotter or clockwise for colder outlet temperature Detail B 5 Turn on fixture s a...

Page 6: ...PING DETAILS Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Valve Specifications Maximum Operating Pressure 125 PSI 861 kPa Flow Rate 45 PSI 310 kPa differential Flow Rate 24 GPM 91 LPM Minimum Flow Rate 0 25 GPM 1 0 LPM Maximum Hot Water Temp 180 F 82 C Minimum Hot Water Supply Temp 5 F 3 C Above Set Point Maximum C...