background image

 

 

Page 2 of 6

ST7017 Installation & Operation Manual

5.  Wrench and an Allen wrench.

2.  Teflon tape for sealing water connections.

4.  Supply connections. 

1.  Wall anchors, screws nuts and washers as

  required.

3.  Supply angle stops, ball valves optionally

 available.

(Not provided by Acorn)

WARNING:

!

SUPPLIES REQUIRED:

Acorn Controls 

Division of Acorn Engineering Company

®

, A member of Morris Group International

!

IMPORTANT

Ÿ

 Implement an annual maintenance program

  to ensure proper operation and temperature
  setting of valve(s).

Ÿ

 This valve is factory preset. However, it can

  be adjusted. It  is the responsibility of the
  installer and or facility maintenance personnel
  to make sure valve outlet temperature is
  properly set.

FAILURE TO READ AND FOLLOW PROPER 
INSTALLATION AND MAINTENANCE 
INSTRUCTIONS MAY RESULT IN PRODUCT 
FAILURE WHICH CAN CAUSE PROPERTY 
DAMAGE, PERSONAL INJURY AND/OR 
DEATH.

Acorn Controls is not responsible for damages 
resulting from improper installation and/or 
maintenance. Installation of this valve shall be in 
accordance with 

Uniform Plumbing Code

.

TO ENSURE ACCURATE AND RELIABLE 
OPERATION OF THIS PRODUCT, IT IS 
ESSENTIAL TO:

Ÿ

 Properly design the system to minimize

  pressure and temperature variations.

You are required to thoroughly read all installation 
instructions and product safety information before 
beginning the installation of this product. 

Ÿ

Flush supply lines of all foreign material such as 
pipe dope, chips or solder prior to connecting to 
mixing valve.

Ÿ

Installation and field adjustment are the 
responsibility of the installer.

Ÿ

To ensure proper installation, review the Manual 
thoroughly to verify rough-ins before beginning 
any work.

Ÿ

Maximum water pressure is 125 PSI (8.62 
bars). Maximum inlet hot water temperature is 
180°F (82°C). Temperature adjustment range* 
is 95°F-130°F (35°C-54°C). Valve assembly 
must be drained prior to being subjected to 
freezing temperatures. Valve includes integral 
check valves.

Manual #7802-127-001

Date: 07/20/2020

PRESSURE

DROP

10

(69)

9

(34)

15

(103)

11

(41.6)

20

(138)

13

(49.2)

30

(207)

15

(56.8)

45

(310)

19

(72)

60

(414)

22

(83.3)

5

(34)

6

(22.7)

FLOW RATE

GPM (LPM)

PSID (KPA)

CV

2.8

10

(37.9)

12

(45.4)

14

(53)

18

(68.1)

21

(79.5)

25

(94.6)

7

(26.5)

3.2

1/2" TUBE

FLOW RATE

GPM (LPM)

3/4" TUBE

Summary of Contents for CONTROLS ST7017

Page 1: ...n damaged by other causes such as mishandling or improper care or abnormal use The repair or replacement of the defective materials shall constitute the sole remedy of the Buyer and the sole remedy of Acorn under this warranty Acorn shall not be liable under any circumstances for incidental consequential or direct charges caused by defects in materials or any delay in the repair or replacement the...

Page 2: ...e shall be in accordance with Uniform Plumbing Code TO ENSURE ACCURATE AND RELIABLE OPERATION OF THIS PRODUCT IT IS ESSENTIAL TO Ÿ Properly design the system to minimize pressure and temperature variations You are required to thoroughly read all installation instructions and product safety information before beginning the installation of this product Ÿ Flush supply lines of all foreign material su...

Page 3: ...trols Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 ADJUSTING STEM LOCKNUT 21 2 64 53 8 137 37 8 96 13 4 45 ST7017 34CPVC SHOWN DETAIL NOT TO SCALE GASKET ADAPTER 1 5 8 HEX NUT ...

Page 4: ...Gasket 5 between Valve body 1 and Adapter 3 then tighten Hex Nut 2 INSTALLATION ST7017 CU CPVC Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 Detail A Detail B TEMPERATURE ADJUSTMENT 2 Turn on fixture so temperature can stabilize 4 Tighten locknut 7 to prevent any unauthorized or a...

Page 5: ...use 2 Thoroughly flush supplies Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Manual 7802 127 001 Date 07 20 2020 INSTALLATION ST7017 PEX TEMPERATURE ADJUSTMENT 3 Using an 1 8 Allen Wrench 9 turn Adjustment Stem 10 counter clockwise for hotter or clockwise for colder outlet temperature Detail B 5 Turn on fixture s a...

Page 6: ...PING DETAILS Acorn Controls Division of Acorn Engineering Company A member of Morris Group International ST7017 Installation Operation Manual Valve Specifications Maximum Operating Pressure 125 PSI 861 kPa Flow Rate 45 PSI 310 kPa differential Flow Rate 24 GPM 91 LPM Minimum Flow Rate 0 25 GPM 1 0 LPM Maximum Hot Water Temp 180 F 82 C Minimum Hot Water Supply Temp 5 F 3 C Above Set Point Maximum C...

Reviews: