background image

Manual #7109-401-001

 

Installation & Operation Manual

 

INSTALLATION INSTRUCTIONS:

Supplies required: (not provided by Acorn

)

1. Wall/deck mounting hardware to install assembly.
2. Wall fasteners for sign mounting.
3. Pipe sealant or Teflon tape for sealing water 

connections.

IMPORTANT: FLUSH WATER SUPPLY LINES PRIOR 
TO CONNECTION TO SAFETY EQUIPMENT.

Notes: 

 Top of spray nozzles must be between 33”- 45' from 

finished floor in order to meet ANSI Z358.1

 Refer to Rough-in for location of supply and drain lines.

 Fragments of Teflon tape or pipe sealant residue can 

interfere with the proper operation of this unit.  Ensure 
pipe sealant methods do not cause contamination in 
the system.

STEP ONE: MOUNTING

1. Mark desired location on counter top and drill a 1.375” 

Dia. hole to accept swing arm assembly. Leave space 
between backs plash and/or wall for swing arm 
assembly to rotate 90 degrees without obstruction. 

2. Place swing arm assembly into drilled hole and 

secure with supplied washer and nut to hold unit in 
place.

3. Assemble strainer to inlet of fitting with close nipple 

provided. 

STEP TWO: SUPPLY LINE

1. Install water line (supplied by others) in a position to 

align with ½” strainer.

2. Open water supply.
3. Test for leaks, proper operation and flow.

STEP THREE: SIGNAGE & INSPECTION

1. Position sign with clear visibility, in close proximity to 

safety equipment and mark mounting hole locations.

2. Select appropriate ¼” anchors, screws and washers 

(Supplied by others) to install signage.

3. Attach inspection tag supplied, with plastic zip tie.

1/2" MALE NPT

CONNECTION TO

WATER LINE

(SUPPLIED BY

INSTALLER)

MOUNTING SCREWS

(PROVIDED BY

INSTALLER)

 

Acorn Safety

 

a division of Acorn Engineering Company™

Page 4 of 6

Date: 05/17/13

Reviews: