Manual #7109-401-001
S0A50-RH ROUGH-IN:
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. All employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity to this equipment.
6. All employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be highly visible, posted in a well-lit area within the area served by the
safety station.
7. For a strong acid or strong caustic hazardous substance the emergency safety equipment should be immediately
adjacent to the hazard.
Installation & Operation Manual
PRELIMINARY STEPS
Acorn Safety
a division of Acorn Engineering Company™
Page 2 of 6
Date: 05/17/13
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN INCHES [MM].
2. REFER TO ADA FOR CLEAR FLOOR/GOUND SPACE AND APPROACH REQUIREMENTS.
*3. ANSI Z358.1 REQUIRES NOZZLES TO BE MOUNTED BETWEEN 33" - 45" [838 - 1138]
ABOVE THE FINISHED FLOOR.
4. ANSI Z358.1 REQUIRES A MINIMUM DISTANCE OF 6" FROM ANY WALL OR
OBSTRUCTION.
5. S0A50-RH SHOWN, S0A50-LH OPPOSITE
6
1
2
"
[166]
12
1
2
"
[318]
3"
[76]
90°
3
5
8
"
[91]
*33" - 45"
[838 - 1138]
1/2" NPT SUPPLY
Ø1-3/8" [35]
HOLE REQ'D
4"
[102]
5
1
8
"
[129]
7
5
8
"
[194]
DECK & BASIN SUPPLIED
BY OTHERS
R10
1
4
" [R259]
5
1
4
"
[132]