ROUGH-IN

 

1. Read the installation instructions prior to beginning the installation.

3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted 

blockages in the safety equipment.

2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or 

damaged parts from Acorn Safety prior to beginning installation.

5. all employees at risk of contamination should be informed and trained in the use of this and any other safety 

equipment. The signage provided should be posted appropriately in close proximity to this equipment.

4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is 

provided for documentation purposes.

Installation & Operation Manual

PRELIMINARY STEPS

Manual #7109-402-001

Page 2 of 5

Revised: 08/16/19

 

Acorn Safety

 

a division of Acorn Engineering Company™

NOTE:

1.

ALL DIMENSIONS ARE IN INCHES [MM].

2.

ANSI Z358.1 REQUIRES NOZZLES TO BE

BETWEEN 33" [385] AND 45" [1143] ABOVE
FLOOR.

3.

RIGHT HAND MODEL SHOWN. LEFT HAND
MODELS AVAILABLE.

1/2" NPT SUPPLY

1

7
8

"

(48)

4

1
2

"

(108)

1

1

2

"

(38)

3

9

16

"

(90)

Ø2

1
4

"

(57)

90°

3

5
8

"

(92)

6

1

8

"

(156)

13

3
4

"

(349)

Ø

1
4

"

(6.4)

3
4

"

(19)

Ø1

1

8

"

(28.5)

MOUNTING DETAIL

Reviews: