![Acorn Safety S0310-FPB Installation, Operation And Maintenance Instructions Download Page 4](http://html1.mh-extra.com/html/acorn-safety/s0310-fpb/s0310-fpb_installation-operation-and-maintenance-instructions_2839781004.webp)
Acorn Safety
a division of Acorn Engineering Company
™
Manual #7109-214-001
Installation & Operation Manual
INSTALLATION INSTRUCTIONS cont.:
Step Four: SANITARY DRAIN CONNECTION
Note: Refer to Rough-ins for supply and drain line locations.
1. Install necessary pipe fittings (supplied by others) to
make connection to 1-1/4" NPT waste tee with sanitary
drain line.
Step Five: TEST
1. Turn on water supply to 3/4" potable water supply.
2. Inspect system for leaks.
3. Operate push handles on hydrant to verify that eyewash
flows properly.
4. Shut off push handle and verify that the eyewash shuts off
properly.
Step Six: SIGNAGE AND INSPECTION TAG
1. Install sign (D) with clear visibility as shown with
appropriate hardware (supplied by others).
2. Attach inspection tag (E) supplied with plastic zip tie to
1/2" supply line as shown.
31
1
2
"
[800]
8"
[203]
11
1
2
"
[292]
1-1/4" NPT
WASTE
WEEP
HOLES
VALVE
BODY
3
4
" FREEZE RESISTANT
BURY VALVE
POROUS GRAVEL
FILL (MIN. 3 CU FT.
BY OTHERS)
FROST LINE
BACK FILL
AREA
Date: 10/28/2013
Page 4 of 7