Acorn Safety S0310-FPB Installation, Operation And Maintenance Instructions Download Page 4

 

Acorn Safety

 

a division of Acorn Engineering Company

Manual #7109-214-001

 

Installation & Operation Manual

 

INSTALLATION INSTRUCTIONS cont.:

Step Four: SANITARY DRAIN CONNECTION

Note: Refer to Rough-ins for supply and drain line locations. 

1. Install necessary pipe fittings (supplied by others) to 
make connection to 1-1/4" NPT waste tee with sanitary 
drain line.

Step Five: TEST

1. Turn on water supply to 3/4" potable water supply.

2. Inspect system for leaks.

3. Operate push handles on hydrant to verify that eyewash 

flows properly.

4. Shut off push handle and verify that the eyewash shuts off 

properly.

Step Six: SIGNAGE AND INSPECTION TAG

1. Install sign (D) with clear visibility as shown with 

appropriate hardware (supplied by others).

2. Attach inspection tag (E) supplied with plastic zip tie to 

1/2" supply line as shown. 

31

1
2

"

[800]

8"

[203]

11

1
2

"

[292]

1-1/4" NPT

WASTE

WEEP

HOLES

VALVE

BODY

3

4

" FREEZE RESISTANT

BURY VALVE

POROUS GRAVEL
FILL (MIN. 3 CU FT.
BY OTHERS)

FROST LINE

BACK FILL

AREA

Date: 10/28/2013

Page 4 of 7

Summary of Contents for S0310-FPB

Page 1: ...discharged solely by replacement of repair of defective material provided Acorn is notified in writing within one year from date of shipment F O B Industry California This warranty does not cover inst...

Page 2: ...y An inspection tag is provided for documentation purposes 5 all employees at risk of contamination should be informed and trained in the use of this and any other safety equipment The signage provide...

Page 3: ...ure to position equipment so that there is a minimum of 12 from any wall or equipment around assembled unit 2 Determine frost line and dig pit deep enough to accommodate a minimum of 3 cubic feet of p...

Page 4: ...potable water supply 2 Inspect system for leaks 3 Operate push handles on hydrant to verify that eyewash flows properly 4 Shut off push handle and verify that the eyewash shuts off properly Step Six...

Page 5: ...contact lenses should remove them immediately prior to or during the flush to prevent the contamination from remaining against the cornea possibly causing unnecessary damage or pain 3 Using thumb and...

Page 6: ...G GALV PIPE 3 7101 081 000 5 8 OD x 3 8 NPTE ADAPTER 4 7101 016 000 NPT COUPLING 5 7101 054 199 CASTING DRAIN 6 7101 046 00 GASKET SS BOWL EYE FACE WASH 7 7101 008 000 BOWL EYE FACE WASH 8 7100 108 19...

Page 7: ...E ADAPTER 4 7101 016 000 NPT COUPLING 5 7101 054 199 CASTING DRAIN 6 7101 046 00 GASKET SS BOWL EYE FACE WASH 7 7101 008 000 BOWL EYE FACE WASH 8 7100 108 199 STRAINER EYE FACE WASH 9 7100 401 000 INS...

Reviews: