8
Installation
1
3
2
5
6
7
4
350-400
Control the scope of delivery before installation. Never install dama-
ged parts and report them to ACO or your specialist dealer.
3.1 Connection to the pipework
Local recycling yard – building material
3.2 ACO Self® Europoint Flat
Installation situation: Garden/Patio or Terraces
Product(s): ACO Self® Europoint Flat
IMPORTANT
Always clean the gully before installation to ensure the function.
Installation suggestion for ACO Self
®
Europoint DN 100
3. Installation
1 = Grating
2 = ACO Self® Europoint Flat, small
3 = KG pipe DN/OD110
4 = Sand
5 = Concrete
6 = Pavior bedding*)
7 = Rectangular concrete paviors
* Sand, gravel or grit bedding (unbound construction method = standard construction
method according to ZTV P StB9).