13
Installation
2
1
4
3
6
5
7
8
350-400
Installation situation: Car park
Product(s): ACO Self® Deep/Round
IMPORTANT
Always clean the gully before installation to ensure the function.
Installation suggestion for ACO Self
®
Europoint Deep/Round
3.3 ACO Self® Europoint Deep/Round
1 = Grating
2 = Top chamber
3 = ACO Self® Europoint Deep/Round
4 = KG pipe
5 = Foundation concrete
6 = Concrete
7 = Pavior bedding*)
8 = Rectangular concrete paviors
* Sand, gravel or grit bedding (unbound construction method = standard construction
method according to ZTV P StB9).