PAGE 10 OF 11
C
Conceal
Panel & Drawer
Assembly
Installation
Slide Drawer - 2 (R) into position over Draer Support Rail -1 (M). Then slide Drawer - 1 (Q)
into position over Drawer Support Rail - 2 (E). Adjust the adjuster for alignment of drawer box.
Box 3 : N Q + N R
N M
N E
N R
N Q
N R
Install the handle (16) in the front or drawer (R). Tighten the Handle Screw (18) using Screw
Driver. (Not included)
Install the Handle (16) in front of drawer (Q). Tighten the Handle Screw
(17) using Screw Driver. (Not included)
Then Push together the Slide Rail (H) with Bed Slat (I) & tighten with
CSK Screw (8) by using Screw Driver. (Make sure the center of Bed Slat (I) is aligned with the
marked line as shown).
Box 2 : N 8
Box 3 : N 16 + N 17 + N 18
N 16
N 18
N R
N Q
N 8
N H
Marked Line
N I
x4
N 16
N 17
x4
x10
N 18
N 17
N 18
N 17
N 9
N 8